<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing DTD v3.0 20080202//EN" "journalpublishing3.dtd">
<article article-type="research-article" dtd-version="3.0" xml:lang="en" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">
	<front>
		<journal-meta>
			<journal-id journal-id-type="publisher-id">FS</journal-id>
			<journal-title-group>
				<journal-title>Forest Systems</journal-title>
				<abbrev-journal-title>FS</abbrev-journal-title>
			</journal-title-group>
			<issn pub-type="epub">2171-9845</issn>
			<publisher>
				<publisher-name>Instituto Nacional de Investigación y Tecnología Agraria y Alimentaria (INIA)</publisher-name>
			</publisher>
		</journal-meta>
		<article-meta>
			<article-id pub-id-type="publisher-id">9845</article-id>
			<article-id pub-id-type="doi">10.5424/fs/2015241-9845</article-id>
			<article-categories>
				<subj-group subj-group-type="heading">
					<subject>Research Article</subject>
				</subj-group>
			</article-categories>
			<title-group>
				<article-title>Overview of MPC applications in supply chains: Potential use and benefits in the management of forest-based supply chains</article-title>
				<alt-title alt-title-type="running-head">Overview MPC supply chains: Potential use and benefits in forest-based supply chains</alt-title>
			</title-group>
			<contrib-group>
			<contrib contrib-type="author" corresp="yes">
					<name>
						<surname>Pinho</surname>
						<given-names>Tatiana M.</given-names>
					</name>
					<aff>INESC TEC Technology and Science, Campus da FEUP, Porto, Portugal</aff>
					<aff>Universidade de Trás-os-Montes e Alto Douro, UTAD, Escola de Ciências e Tecnologia, Quinta de Prados, Vila Real, Portugal</aff>
				</contrib>
				<contrib contrib-type="author" corresp="no">
					<name>
						<surname>Moreira</surname>
						<given-names>A. Paulo</given-names>
					</name>
					<aff>INESC TEC Technology and Science, Campus da FEUP, Porto, Portugal</aff>
					<aff>Faculty of Engineering, University of Porto, Porto, Portugal</aff>
				</contrib>
				<contrib contrib-type="author" corresp="no">
					<name>
						<surname>Veiga</surname>
						<given-names>Germano</given-names>
					</name>
					<aff>INESC TEC Technology and Science, Campus da FEUP, Porto, Portugal</aff>
				</contrib>
				<contrib contrib-type="author" corresp="no">
					<name>
						<surname>Boaventura-Cunha</surname>
						<given-names>José</given-names>
					</name>
					<aff>INESC TEC Technology and Science, Campus da FEUP, Porto, Portugal</aff>
					<aff>Universidade de Trás-os-Montes e Alto Douro, UTAD, Escola de Ciências e Tecnologia, Quinta de Prados, Vila Real, Portugal</aff>
				</contrib>
			</contrib-group>
			<author-notes>
				<corresp>should be addressed to Tatiana M. Pinho: <email xlink:href="tatiana.m.pinho@inesctec.pt">tatiana.m.pinho@inesctec.pt</email></corresp>
			</author-notes>
			<pub-date pub-type="epub">
				<day>31</day>
				<month>12</month>
				<year>2015</year>
			</pub-date>
			<pub-date pub-type="collection">
				<year>2015</year>
			</pub-date>
			<volume>24</volume>
			<issue>3</issue>
			<elocation-id content-type="doi">10.5424/fs/2015241-9845</elocation-id>
			<history>
				<date date-type="recibido">
					<day>09</day>
					<month>01</month>
					<year>2015</year>
				</date>
				<date date-type="aceptado">
					<day>29</day>
					<month>09</month>
					<year>2015</year>
				</date>
			</history>
			<permissions>
				<copyright-statement>© 2015 INIA</copyright-statement>
				<copyright-year>2015</copyright-year>
				<license license-type="open-access" xlink:href="http://creativecommons.org/licenses/by-nc/3.0/">
					<license-p>This is an open access article distributed under the Creative Commons Attribution License (CC by 3.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.</license-p>
				</license>
			</permissions>
			<abstract id="abstract01">
				<title>Abstract</title>
				<p><italic>Aim of study</italic>: This work aims to provide an overview of Model Predictive Controllers (MPC) applications in supply chains, to describe the forest-based supply chain and to analyse the potential use and benefits of MPC in a case study concerning a biomass supply chain.</p>
		<p><italic>Area of study</italic>: The proposed methods are being applied to a company located in Finland.</p>
		<p><italic>Material and methods</italic>: Supply chains are complex systems where actions and partners’ coordination influence the whole system performance. The increase of competitiveness and need of quick responses to the costumers implies the use of efficient management techniques. The control theory, particularly MPC, has been successfully used as a supply chain management tool. MPC is able to deal with dynamic interactions between the partners and to globally optimize the supply chain performance in the presence of disturbances. However, as far as is authors’ knowledge, there are no applications of this methodology in the forest-based supply chains. This work proposes a control architecture to improve the performance of the forest supply chain. The controller is based on prediction models which are able to simulate the system and deal with disturbances.</p>
		<p><italic>Main results</italic>: The preliminary results enable to evaluate the impacts of disturbances in the supply chain. Thus, it is possible to react beforehand, controlling the schedules and tasks’ allocation, or alert the planning level in order to generate a new plan.</p>
		<p><italic>Research highlights</italic>: Overview of MPC applications in supply chains; forest-based supply chain description; case study presentation: wood biomass supply chain for energy production; MPC architecture proposal to decrease the operation times.</p>
				</abstract>
			<kwd-group>
				<title>Keywords</title>
				<kwd>biomass</kwd>
				<kwd>forest</kwd>
				<kwd>Model Predictive Control</kwd>
				<kwd>planning</kwd>
				<kwd>supply chain</kwd>
			</kwd-group>
			<funding-group>
			<funding-statement>This work was supported by the FCT – Fundação para a Ciência e Tecnologia through the PhD Studentship SFRH/BD/98032/2013, program POPH – Programa Operacional Potencial Humano and FSE – Fundo Social Europeu. This research has also received funding from the European Union Seventh Framework Programme (FP7/2007-2013) under grant agreement n. [604286].</funding-statement>
			</funding-group>
		</article-meta>
		<notes>
		<p><bold>Competing interests</bold>: The authors have declared that no competing interests exist.</p>
		</notes>
	</front>
	<body>
		<sec id="S1">
			<title>Introduction</title>
			<p>A supply chain is characterized by a set of inventory and entities, in which are included producers, suppliers, distributors and retailers, where materials are transformed in products and delivered to the final customer (<xref ref-type="bibr" rid="CIT0026">Eshlaghy &amp; Razavi, 2011</xref>; <xref ref-type="bibr" rid="CIT0001">Al-e-Hashem <italic>et al.</italic>, 2012</xref>). Raw materials, intermediate or finished products flow between geographically distributed facilities, which acquire, transform, store or sell them (<xref ref-type="bibr" rid="CIT0063">Mourtzis <italic>et al.</italic>, 2008</xref>), existing a direct flow of material and an inverse flow of information (<xref ref-type="bibr" rid="CIT0026">Eshlaghy &amp; Razavi, 2011</xref>; <xref ref-type="bibr" rid="CIT0001">Al-e-Hashem <italic>et al.</italic>, 2012</xref>), as presented in <xref ref-type="fig" rid="F0001">Figure 1</xref>.</p>
			<fig id="F0001">
					<label>Figure 1.</label>
					<caption>
						<title>Supply chain flows (adapted from <xref ref-type="bibr" rid="CIT0061">Min &amp; Zhou, 2002</xref>).</title>
					</caption>
					<graphic xlink:href="forest_e039_f01.jpg" xmlns:xlink="http://www.w3.org/1999/xlink"/>
	</fig>
		<p>With the increase of economic globalization, competitiveness and need of quickly respond to customers demand, the management of supply chains is acquiring importance in many companies and sectors (<xref ref-type="bibr" rid="CIT0071">Petrovic <italic>et al.</italic>, 1999</xref>; <xref ref-type="bibr" rid="CIT0026">Eshlaghy &amp; Razavi, 2011</xref>; <xref ref-type="bibr" rid="CIT0050">Li <italic>et al.</italic>, 2010</xref>; <xref ref-type="bibr" rid="CIT0073">Rong <italic>et al.</italic>, 2011</xref>; <xref ref-type="bibr" rid="CIT0001">Al-e-Hashem <italic>et al.</italic>, 2012</xref>; <xref ref-type="bibr" rid="CIT0004">Badole <italic>et al.</italic>, 2012</xref>; <xref ref-type="bibr" rid="CIT0051">Li <italic>et al.</italic>, 2012</xref>; <xref ref-type="bibr" rid="CIT0068">Park &amp; Jeong, 2014</xref>). However, supply chains are complex systems and their management depends on the level of knowledge acquired about them (<xref ref-type="bibr" rid="CIT0043">Janamanchi &amp; Burns, 2013</xref>). Besides that, the control and management of a supply chain is an area with many and rapid changes, developing day by day, as is shown in the literature (<xref ref-type="bibr" rid="CIT0071">Petrovic <italic>et al.</italic>, 1999</xref>; <xref ref-type="bibr" rid="CIT0026">Eshlaghy &amp; Razavi, 2011</xref>). The concept of uncertainty is also often related with supply chains, requiring more flexibility and so making the management more complex (<xref ref-type="bibr" rid="CIT0059">Mentzer <italic>et al.</italic>, 2001</xref>; <xref ref-type="bibr" rid="CIT0086">Vorst &amp; Beulens, 2002</xref>).</p>
		<p>The goal of a management system is to reduce the processing and delivery times, with the increase of products and services quality. The use of efficient management techniques will allow the reduction of production cost, inventory, supplying and service costs in each process (<xref ref-type="bibr" rid="CIT0026">Eshlaghy &amp; Razavi, 2011</xref>). In some companies, the incorporation of management techniques represented cost savings of 5-6 % (<xref ref-type="bibr" rid="CIT0041">Huang <italic>et al.</italic>, 2009</xref>).</p>
		<p>The functions performed in a supply chain are interdependent. In this sense, an entity’s inefficiency implies a decrease in the overall performance (<xref ref-type="bibr" rid="CIT0080">Stevens, 1989</xref>; <xref ref-type="bibr" rid="CIT0083">Swaminathan <italic>et al.</italic>, 1998</xref>; <xref ref-type="bibr" rid="CIT0086">Vorst &amp; Beulens, 2002</xref>). In this way, the enterprises should integrate their objectives and activities to optimize the whole supply chain. If each enterprise tries to optimize its performance, the supply chain will become under-optimized (<xref ref-type="bibr" rid="CIT0086">Vorst &amp; Beulens, 2002</xref>; <xref ref-type="bibr" rid="CIT0026">Eshlaghy &amp; Razavi, 2011</xref>; <xref ref-type="bibr" rid="CIT0068">Park &amp; Jeong, 2014</xref>). Thus, in an integrated point of view, the flow of material must be optimized, i.e., the products must be produced and distributed in the adequate quantities, places and times, with minimized costs to satisfy demands. The information flow between supply chain members is also an important issue, as it influences the production schedules, inventory control and delivery plans (<xref ref-type="bibr" rid="CIT0049">Lee <italic>et al.</italic>, 1997</xref>; <xref ref-type="bibr" rid="CIT0026">Eshlaghy &amp; Razavi, 2011</xref>; <xref ref-type="bibr" rid="CIT0068">Park &amp; Jeong, 2014</xref>). However, if the supply chain is multi-business oriented, this integration and coordination reveal themselves complex (<xref ref-type="bibr" rid="CIT0080">Stevens, 1989</xref>; <xref ref-type="bibr" rid="CIT0069">Parmigiani <italic>et al.</italic>, 2011</xref>; <xref ref-type="bibr" rid="CIT0068">Park &amp; Jeong, 2014</xref>). Furthermore, the previous goal of long-term optimization has been replaced for short term fluctuations in products’ demand. Thereby, the supply chain management, in many cases performed by static models, needs to employ new dynamic and complex tools (<xref ref-type="bibr" rid="CIT0048">Laurikkala <italic>et al.</italic>, 2005</xref>).</p>
		<p>The sustainable management of supply chains is also receiving more attention (<xref ref-type="bibr" rid="CIT0069">Parmigiani <italic>et al.</italic>, 2011</xref>; <xref ref-type="bibr" rid="CIT0079">Seuring, 2011</xref>). The wood, as a natural resource, is integrated into this range of management. However, at the present, does not exist a common consensual definition of the forest sustainable management. This sector management should attend to aspects such as ambient preservation and future sustainability, always aiming profit maximization (<xref ref-type="bibr" rid="CIT0031">Guinard <italic>et al.</italic>, 1998</xref>; <xref ref-type="bibr" rid="CIT0085">Varma <italic>et al.</italic>, 2000</xref>; <xref ref-type="bibr" rid="CIT0003">Alonso-Ayuso <italic>et al.</italic>, 2011</xref>). Besides that, requirements imposed by the industry, government, public, products, recreation, conservation, and preservation laws have increased the complexity of forest-based supply chain management (<xref ref-type="bibr" rid="CIT0006">Beaudoin <italic>et al.</italic>, 2008</xref>).</p>
		<p>The control techniques have been successfully applied to the supply chain management due to their ability to handle with systems dynamic behaviour. The MPC (Model Predictive Control), an advanced control methodology, has distinct characteristics that give it advantages in the treatment of such problems. Although this technique has already been applied to supply chains management in several areas, this has not happened in the forest industry. Therefore, this work proposes the analysis of the potential application of MPC to the forest-based supply chains management.</p>
		<p>This paper is organized as follows: in section 2 is elaborated a review of the state-of-the-art of MPC application in supply chains, also presenting a brief overview of MPC concept. Section 3 presents the forest supply chain, describing its main processes, participants and faced problems. Section 4 describes the potential use of MPC techniques in the forest-based supply chain, particularizing for an use case in the biomass sector. Finally, in section 5 are drawn the main conclusions.</p>
		</sec>
		<sec id="S2">
			<title>MPC application in supply chains</title>
			<p>As previously mentioned, a supply chain management consists of a set of approaches that efficiently integrate the several entities involved in demand satisfaction at the lower possible price (<xref ref-type="bibr" rid="CIT0029">Fu <italic>et al.</italic>, 2014</xref>). Thus, the global performance is highly dependent on the coordination and actions of each contributor (<xref ref-type="bibr" rid="CIT0070">Perea-López <italic>et al.</italic>, 2003</xref>; <xref ref-type="bibr" rid="CIT0054">Maestre <italic>et al.</italic>, 2009</xref>). In the current paradigm, enterprises do not compete with each other in the same supply chain. Instead, they act as a whole and are the supply chains that fight for leadership. The one that provides to the customer the intended products in the right conditions of quantity, time, place and price will stand out (<xref ref-type="bibr" rid="CIT0010">Braun <italic>et al.</italic>, 2003</xref>). However, the supply chain is a complex system, where the influence of many factors should be studied and considered in its management (<xref ref-type="bibr" rid="CIT0029">Fu <italic>et al.</italic>, 2014</xref>).</p>
		<p>Traditionally, in supply chain management have been used heuristics or mathematical programming techniques (<xref ref-type="bibr" rid="CIT0052">Li &amp; Marlin, 2009</xref>). A common optimization method in supply chains is the individual analysis of the constituent elements. This ignores the fact that there are dynamic interactions between the several entities and that optimization should be performed as a whole. Control techniques are adequate to deal with these dynamic interactions of the system and, therefore, to optimize supply chains performance, often subjected to time varying demand conditions (<xref ref-type="bibr" rid="CIT0060">Mestan <italic>et al.</italic>, 2006</xref>). In this sense, control theory has been used as a management tool due to its ability in dealing with uncertainty, delays and lack of information (<xref ref-type="bibr" rid="CIT0008">Blanco <italic>et al.</italic>, 2008</xref>; <xref ref-type="bibr" rid="CIT0076">Sarimveis <italic>et al.</italic>, 2008</xref>; <xref ref-type="bibr" rid="CIT0036">Hai <italic>et al.</italic>, 2011</xref>; <xref ref-type="bibr" rid="CIT0042">Ivanov <italic>et al.</italic>, 2012</xref>), which occur in supply chains.</p>
		<p>The implementation of MPC (Model Predictive Control), also designated as rolling-horizon planning, receding-horizon control, dynamic matrix control or dynamic linear programming, in inventory control and supply chain management has revealed itself an interesting option (<xref ref-type="bibr" rid="CIT0010">Braun <italic>et al.</italic>, 2003</xref>; <xref ref-type="bibr" rid="CIT0062">Miranbeigi <italic>et al.</italic>, 2010</xref>; <xref ref-type="bibr" rid="CIT0091">Wang &amp; Boyd, 2010</xref>; <xref ref-type="bibr" rid="CIT0036">Hai <italic>et al.</italic>, 2011</xref>; <xref ref-type="bibr" rid="CIT0028">Fu <italic>et al.</italic>, 2013</xref>). Its main characteristics and advantages are: a cost function that measures the supply chain performance that can be maximized or minimized, MPC can be formulated to be stable and robust even in the presence of disturbances and stochastic demand (<xref ref-type="bibr" rid="CIT0090">Wang <italic>et al.</italic>, 2007</xref>; <xref ref-type="bibr" rid="CIT0072">Puigjaner &amp; Laínez, 2008</xref>; <xref ref-type="bibr" rid="CIT0028">Fu <italic>et al.</italic>, 2013</xref>). Also, it enables the integration of constraints in production, inventory levels and dispatch capacity, and defines operational objectives concerning how the following/monitoring of inventory goals and responses to customers’ orders are achieved (<xref ref-type="bibr" rid="CIT0090">Wang <italic>et al.</italic>, 2007</xref>), among others.</p>
		<p>The operating principle behind MPC is based on the online optimization with a sliding prediction window that evaluates a cost function for the control action determination (<xref ref-type="bibr" rid="CIT0077">Seborg <italic>et al.</italic>, 2004</xref>; <xref ref-type="bibr" rid="CIT0014">Camacho &amp; Bordons, 2007</xref>; <xref ref-type="bibr" rid="CIT0002">Alessandri <italic>et al.</italic>, 2011</xref>). Namely, the MPC concept can be summarized as follows: a model of the system is used to predict, at each sampling instant<italic> k</italic>, the future outputs (<italic>ŷ</italic>) over a determined prediction time horizon <italic>P</italic>, as represented in <xref ref-type="fig" rid="F0002">Figure 2</xref>. The values of <italic>ŷ</italic> depend on both the past inputs and outputs as well as on the past and future control actions. An optimization algorithm is used to maximize or to minimize a cost function to compute the future control actions, over a control horizon <italic>M</italic>, that will try to keep the system as near as possible to the set point (target), which can be constant or variable. From the evaluated set of control actions, only the first control action is effectively implemented. At each next sampling instant the whole process is repeated in order to update the model parameters and compute the next control action to implement (<xref ref-type="bibr" rid="CIT0070">Perea-López <italic>et al.</italic>, 2003</xref>; <xref ref-type="bibr" rid="CIT0024">Doganis <italic>et al.</italic>, 2008</xref>; <xref ref-type="bibr" rid="CIT0076">Sarimveis <italic>et al.</italic>, 2008</xref>). The main advantages of MPC in supply chains are its ability to deal with variability in supply and demand and consider the future evolution of the setpoint and known disturbances.</p>
		<fig id="F0002">
					<label>Figure 2.</label>
					<caption>
						<title>Basic concept of MPC operation (adapted from <xref ref-type="bibr" rid="CIT0077">Seborg <italic>et al.</italic>, 2004</xref>; <xref ref-type="bibr" rid="CIT0014">Camacho &amp; Bordons, 2007</xref>).</title>
					</caption>
					<graphic xlink:href="forest_e039_f02.jpg" xmlns:xlink="http://www.w3.org/1999/xlink"/>
	</fig>
		<p>In this context, a fundamental requirement of MPC is a supply chain model that adequately describes the dynamic behaviour of the system (<xref ref-type="bibr" rid="CIT0058">Mastragostino <italic>et al.</italic>, 2014</xref>). Through this process model, the MPC will be able to react beforehand to possible disturbances (<xref ref-type="bibr" rid="CIT0087">Wang, 2013</xref>).</p>
		<p>The first application of MPC to inventory management was depicted in 1992, in the Kapsiotis &amp; Tzafestas work (<xref ref-type="bibr" rid="CIT0044">Kapsiolis &amp; Tzafestas, 1992</xref>; <xref ref-type="bibr" rid="CIT0029">Fu <italic>et al.</italic>, 2014</xref>). Afterwards, <xref ref-type="bibr" rid="CIT0084">Tzafestas <italic>et al.</italic> (1997)</xref> applied MPC concept in decision support systems to solve integrated problems of planning and production in a stochastic environment.</p>
		<p>In the <xref ref-type="bibr" rid="CIT0076">Sarimveis <italic>et al.</italic> (2008)</xref> work it was performed a review of control theory application in supply chain management, considering its classical formulation and proposing other sophisticated methodologies, in which MPC is included. Follows the presentation of several developments made to this field.</p>
		<p>In <xref ref-type="bibr" rid="CIT0009">Bose &amp; Pekny (2000)</xref>, MPC was applied to planning and scheduling problems, enabling the integration of uncertainty in material processing time, random equipment breakdowns or uncertainties in demand. Unlike other techniques applied to these problems that fix a moment in time, MPC allows the time evolution monitoring of the system, i.e., allows its dynamic analysis. In this work, the predictive model calculates the goal of flow inventory while the scheduling model attempts to achieve the desired inventory levels in tasks. Thus, target inventory is the controlled variable and scheduling tasks the manipulated variables.</p>
		<p>In the work of <xref ref-type="bibr" rid="CIT0010">Braun <italic>et al.</italic> (2003)</xref> it was demonstrated the MPC applicability in supply chains management, emphasizing its robustness, flexibility and ability to reduce safety stocks. Its performance was proven in a problem with six nodes, two products and three echelons proposed by Intel Corporation, where existed demand uncertainty and model inaccuracies. Besides that, they showed the conversion of available information in the supply chain in MPC variables through an example of two nodes supply chain. With the application of MPC in the larger problem, the authors conceptually proved the efficiency of MPC handling with plant-model mismatch, constraints and information sharing.</p>
		<p>To maximize profit in supply chains with multi-products, distribution networks with multi-levels with plants with multi-products, <xref ref-type="bibr" rid="CIT0070">Perea-López <italic>et al.</italic> (2003)</xref> applied a predictive control strategy. In their work were compared centralized and decentralized management strategies, confirming increases of profit up to 15 % on the centralized approach. The underlying methodology of their work encompassed a discrete dynamic model MILP (Mixed Integer Linear Programming) of the system with information and material flows, a dynamic optimization framework that considers all supply chain elements and respective interactions, and a predictive control approach that updates the decision variables when changes occur in the supply chain.</p>
		<p><xref ref-type="bibr" rid="CIT0078">Seferlis &amp; Giannelos (2004)</xref> applied the MPC principles in a control approach based on a two levels optimization of supply chains with multi-products, multi-echelons and independent production lines. As in a management system, the goal is to satisfy the customers’ demands at the lowest operating cost. A penalty term is used to avoid abrupt changes. There were also used dedicated feedback controllers to keep the inventory of the several nodes between pre-set levels. The developed tool was tested presenting good performance for deterministic and stochastic variations in demand. In addition, was studied the influence of the delays in transport, the dimension of the control horizon and of the models quality in the control performance.</p>
		<p><xref ref-type="bibr" rid="CIT0025">Dunbar &amp; Desa (2005)</xref> demonstrated through a realistic simulation example the applicability of distributed nonlinear MPC to dynamic management of supply chains. This is based on local optimization of each subsystem and the corresponding result delivered to the adjacent subsystems.</p>
		<p><xref ref-type="bibr" rid="CIT0060">Mestan <italic>et al.</italic> (2006)</xref> considered in their work a hybrid supply chain optimization through MPC, with continuous and discrete dynamics and logical rules. The system was modelled by MLD (Mixed Logical Dynamical) and the overall profit optimized by MPC. In addition, unknown but measurable changes were implemented in demands in order to examine the dynamic responses of the different nodes, i.e., assuming that at current instances demands are measured, but the future demands are unknown. Finally, were compared a centralized support decision scheme and two decentralized approaches. The results showed a better inventory management and production scheduling with the centralized configuration of MPC.</p>
		<p>In <xref ref-type="bibr" rid="CIT0090">Wang <italic>et al.</italic> (2007)</xref>, the authors have implemented a MPC technique in tactical management problems encountered in the semiconductors manufacturing supply chain. Among the found problems, are emphasized the high stochasticity and nonlinearity in production times, demand and customer orders. The advantages of MPC were demonstrated using three benchmark problems. There were also tested the effects of model parameters synchronism by comparing robustness and performance metrics. Besides this work, in <xref ref-type="bibr" rid="CIT0089">Wang <italic>et al.</italic> (2004)</xref> and <xref ref-type="bibr" rid="CIT0088">Wang &amp; Rivera (2008)</xref>, the same issue of MPC application in tactical decisions of semiconductor manufacturing supply chains management was also addressed.</p>
		<p><xref ref-type="bibr" rid="CIT0008">Blanco <italic>et al.</italic> (2008)</xref> applied the MPC in the operational planning of a fruit industry supply chain. This choice was based on MPC’s ability to deal with uncertain, multivariable and highly interactive systems. This type of supply chain, contrary to others, seeks to create a pre-delivery commitment, rather than respond to online demands. The work consisted in a computer aided decision tool that includes uncertainty and disruption episodes in short-term and medium/large term forecasts of important parameters (resources availability, costs, among others).</p>
		<p><xref ref-type="bibr" rid="CIT0024">Doganis <italic>et al.</italic> (2008)</xref> developed a framework that integrates MPC and sales Time Series Forecasting for supply chain management. The data generated by the time series forecasts is used as inputs to the predictive control module. Several linear and nonlinear forecasting methodologies were tested, concluding that the time-series presented mostly a nonlinear behaviour. The results proved that the forecasting accuracy has impact in the control performance.</p>
		<p>Given the need for competitiveness in the market and the need to deal efficiently with supply chain dynamics, <xref ref-type="bibr" rid="CIT0072">Puigjaner &amp; Laínez (2008)</xref> developed a supply chain integrated solution that incorporates design-planning and financial formulations. For this, it was used an MPC approach with stochastic optimization and an MILP model for problem representation. The developed solution was tested in a case study. The proposed control strategy proved to be efficient in dealing with uncertainty and incidences through the combination of reactive and preventive approaches. Also, this strategy may operate as a supervisory module contributing to close the information loop in the dynamic supply chain management.</p>
		<p>Within semiconductors manufacturing supply chains, <xref ref-type="bibr" rid="CIT0041">Huang <italic>et al.</italic> (2009)</xref> presented a testbed that integrates DEVS (Discrete EVent System Specification), MPC and KIB (Knowledge Interchange Broker) in a scalable and robust manner. The testbed was evaluated with different experiments, showing the benefits and challenges related to using and developing of manufacturing processes realistic models and processes control policies. The MPC control algorithm was based on a linear time-invariant model. Through simulations was proved that the MPC remains stable and robust even in the presence of uncertainty and nonlinear conditions.</p>
		<p>To deal with real-time optimization of a supply chain with uncertainty, <xref ref-type="bibr" rid="CIT0052">Li &amp; Marlin (2009)</xref> developed a new robust MPC method. The method performance was proven by its application to a real industrial problem with multi-echelon, showing decreases in stock lacks without excessive inventories.</p>
		<p>Integrated into the overall management of inventory at strategic and tactical levels, <xref ref-type="bibr" rid="CIT0002">Alessandri <italic>et al.</italic> (2011)</xref> implemented an MPC approach in real-time decision in tactical transport. MPC was used to predict demand, in a reliable and short time manner. To maximize the supply chain profit, <xref ref-type="bibr" rid="CIT0064">Niu <italic>et al.</italic> (2013)</xref> implemented an MPC method to predict demand and control the inventory in a single unit. As manipulated variables were defined the ordering and the pricing, with different dynamics in the supply chain. Ordering is seen as having a deterministic and a stochastic component. This strategy was compared to another without pricing dynamic policy and order-up-to-level showing its efficiency.</p>
		<p><xref ref-type="bibr" rid="CIT0081">Subramanian <italic>et al.</italic> (2013)</xref> used distributed and cooperative MPC in supply chain inventory management. In this strategy, the local decisions of the several entities are taken based on the overall optimization of the supply chain. The solution was tested for an example with two nodes and compared with other conventional distributed operating policies. Still in inventory supply chain management, <xref ref-type="bibr" rid="CIT0082">Subramanian <italic>et al.</italic> (2014)</xref> proposed the application of economic MPC with closed-loop properties. Besides that, demonstrated scheduling and control integration through an example of a manufacturing facility with multiproduct production.</p>
		<p><xref ref-type="bibr" rid="CIT0058">Mastragostino <italic>et al.</italic> (2014)</xref> presented a support decision system for supply chain management based on a robust MPC strategy. This system was tested in two case studies with two processes and revealed a marked decrease in demands return. The work includes two uncertainty propagation mechanisms, one based on open-loop approach and other approximately closedloop, i.e., a less computational expensive method to approximate the future closed-loop behaviour.</p>
		<p>Besides the above-mentioned studies, many other works have been addressing this theme (e.g. <xref ref-type="bibr" rid="CIT0036">Hai <italic>et al.</italic>, 2011</xref>; <xref ref-type="bibr" rid="CIT0028">Fu <italic>et al.</italic>, 2013</xref>; <xref ref-type="bibr" rid="CIT0029">Fu <italic>et al.</italic>, 2014</xref>; <xref ref-type="bibr" rid="CIT0037">Han &amp; Qiao, 2014</xref>; <xref ref-type="bibr" rid="CIT0047">Kawtar <italic>et al.</italic>, 2014</xref>; <xref ref-type="bibr" rid="CIT0067">Pannek &amp; Frazzon, 2014</xref>). However, as far as is the authors’ knowledge there is no example of MPC application to the forest supply chain. Based on the advantages presented with the application of MPC in other supply chains, it is proposed in this work the implementation of this technique in the forest supply chain, presenting a use case on biomass supply chain.</p>
		</sec>
		<sec id="S3">
			<title>Forest-based supply chain</title>
			<p>Forest planning problems are several and cover aspects from planting, cutting, construction of access roads to transportation, among others (<xref ref-type="bibr" rid="CIT0034">Hachemi <italic>et al.</italic>, 2011</xref>). In these, it is necessary to attend to environmental and enterprise problems, as well as operation rules (<xref ref-type="bibr" rid="CIT0034">Hachemi <italic>et al.</italic>, 2011</xref>). Furthermore, forest planning is performed in a stochastic environment without high quality information. This is due to the fact that information collection in this area, such as trees diameter, species, dimension and location of internal nodes, among others, is complex and expensive (<xref ref-type="bibr" rid="CIT0019">Chauhan <italic>et al.</italic>, 2009</xref>).</p>
		<p>At the beginning of the 70’s, the forest management paradigm was mainly focused on stands and on trees, undergone a change with modifications of public perception about environmental issues. Since then, are being incremented management practices oriented to ecosystems (<xref ref-type="bibr" rid="CIT0038">Heinimann, 2010</xref>), considering features such as wildlife, water, soil, landscape, etc. (<xref ref-type="bibr" rid="CIT0057">Martins <italic>et al.</italic>, 2005</xref>; <xref ref-type="bibr" rid="CIT0056">Marques <italic>et al.</italic>, 2011</xref>). Thus, forest planning, formerly simple and direct, become highly complex, with different planning levels, concerning large regions and small stands (<xref ref-type="bibr" rid="CIT0021">Church <italic>et al.</italic>, 2000</xref>). This becomes even more complicated in multi-business environment (<xref ref-type="bibr" rid="CIT0011">Bredström <italic>et al.</italic>, 2004</xref>; <xref ref-type="bibr" rid="CIT0005">Beaudoin <italic>et al.</italic>, 2007</xref>). Besides that, with the new customer oriented forest supply chain approach, it is necessary to daily manage the ongoing operations (<xref ref-type="bibr" rid="CIT0066">Palander <italic>et al.</italic>, 2005</xref>). This new approach aims to deliver the right products, at the right times and quantities (<xref ref-type="bibr" rid="CIT0016">Carlsson &amp; Rönnqvist, 2005</xref>).</p>
		<p>Since the 60’s, mathematical models have been used in forest-based planning problems (<xref ref-type="bibr" rid="CIT0030">Goycoolea <italic>et al.</italic>, 2005</xref>; <xref ref-type="bibr" rid="CIT0005">Beaudoin <italic>et al.</italic>, 2007</xref>). FORPLAN is probably the most well-known forest modelling system (<xref ref-type="bibr" rid="CIT0021">Church <italic>et al.</italic>, 2000</xref>). Although many models have been developed, in many cases, the planning continues to be often based on intuition and experience (<xref ref-type="bibr" rid="CIT0005">Beaudoin <italic>et al.</italic>, 2007</xref>). Even more, the commonly used approach is centralized, which is not the most indicated to multi-business contexts (<xref ref-type="bibr" rid="CIT0007">Beaudoin <italic>et al.</italic>, 2010</xref>). The spatial component has also been present in forest planning because it has effects on wildlife, landscape and on other environmental issues. Among the common practices is the forbiddance, imposed by legislation, of large continuous clearcut areas (<xref ref-type="bibr" rid="CIT0030">Goycoolea <italic>et al.</italic>, 2005</xref>).</p>
		<p>Forest operations management deals with time scales ranging from a strategic level (decades) to an operational level (daily and hourly tasks) (<xref ref-type="bibr" rid="CIT0020">Chauhan <italic>et al.</italic>, 2011</xref>). The highest levels of planning establish limits to the following levels. In particular, for example in the harvesting task, the strategic level set the volume of wood to cut in the next decades to achieve the forest management goal. At the tactical level are chosen which stands to cut in each period and which access roads to build based on the strategic goal. Finally, at the operational level are defined how many and which are the collection sites, roads are built and schedules are made (<xref ref-type="bibr" rid="CIT0022">Clark <italic>et al.</italic>, 2000</xref>). At the tactical level are also defined the required production capacities. Through these, it is possible to the company determine whether to subcontract other companies for the year and define their work hours (<xref ref-type="bibr" rid="CIT0006">Beaudoin <italic>et al.</italic>, 2008</xref>).</p>
		<p><xref ref-type="fig" rid="F0003">Figure 3</xref> presents the generic processes of the forest supply chain. As can be seen, the first process to be considered is the harvesting in forest areas when trees are cut and branches removed. The species vary depending on the stands (<xref ref-type="bibr" rid="CIT0074">Rönnqvist, 2003</xref>). By “stands” should be understood areas for forest harvesting at operational level. At the strategic level, these areas are called “macro-stands” (<xref ref-type="bibr" rid="CIT0018">Cea &amp; Jofré, 2000</xref>). Later, the forwarding process occurs, in which the logs are moved from the cutting areas to the proximity of access roads in the forest. Finally, the wood is transported to the desired site which can include sawmills, pulp-mills, paper-mills, heating plants and power plants (<xref ref-type="bibr" rid="CIT0074">Rönnqvist, 2003</xref>).</p>
		<fig id="F0003">
					<label>Figure 3.</label>
					<caption>
						<title>Generic scheme of the forest-based supply chain processes.</title>
					</caption>
					<graphic xlink:href="forest_e039_f03.jpg" xmlns:xlink="http://www.w3.org/1999/xlink"/>
	</fig>
		<p>The entities involved in this supply chain are several and can vary from country to country and depend on the addressed industry. Thus, as main actors can be mentioned: industrial forestry companies, public or private, which have forest lands and mills for processing; associations of forest owners, representing private entities and with their own mills, independent mills, without associated forest lands, and independent owners, not linked to any industry (<xref ref-type="bibr" rid="CIT0074">Rönnqvist, 2003</xref>; <xref ref-type="bibr" rid="CIT0016">Carlsson &amp; Rönnqvist, 2005</xref>).</p>
		<p>Harvesting planning aims to long-term tasks scheduling in order to maximize the cut volume and the profit respecting the imposed restrictions (<xref ref-type="bibr" rid="CIT0053">Liu <italic>et al.</italic>, 2006</xref>). One of the restrictions of this problem is that some jurisdictions prohibit clearcuts, i.e., large areas cut (<xref ref-type="bibr" rid="CIT0013">Brumelle <italic>et al.</italic>, 1998</xref>; <xref ref-type="bibr" rid="CIT0032">Gunn &amp; Richards, 2005</xref>). Moreover, stands adjacent to clearcuts cannot also be cut until the clearcut stand has regenerated to a certain level (<xref ref-type="bibr" rid="CIT0032">Gunn &amp; Richards, 2005</xref>). These adjacency restrictions complicated even more the process, partly nullifying the models previously used in harvesting planning (<xref ref-type="bibr" rid="CIT0013">Brumelle <italic>et al.</italic>, 1998</xref>). This has increased the use of heuristics instead of mathematical programming in planning models development. However, with this technique it is difficult to find, with certain, the global optimum (<xref ref-type="bibr" rid="CIT0039">Heinonen &amp; Pukkala, 2004</xref>). Another relevant factor that also influences the annual planning of harvesting is the climatic conditions (<xref ref-type="bibr" rid="CIT0045">Karlsson <italic>et al.</italic>, 2003</xref>; <xref ref-type="bibr" rid="CIT0046">Karlsson <italic>et al.</italic>, 2004</xref>).</p>
		<p>Another issue that must be taken in account is the increased use of mechanized equipment in the forestry sector. This is mainly due to the need for increase productivity, i.e., for economic reasons, and for increase security (<xref ref-type="bibr" rid="CIT0055">Marshall <italic>et al.</italic>, 2006</xref>). There are two types of equipment used in harvesting: the harvesters and the forwarders. The harvesters cut the logs and let them in the forest, where the forwarders collect and pile them next to the access road. The trucks collect the logs from the piles and transport them to the desired destination. Because of this work sequence it is needed synchronization in tasks planning. The time and cost of moving equipment between stands will depend on the distance between them (<xref ref-type="bibr" rid="CIT0012">Bredström &amp; Rönnqvist, 2008</xref>).</p>
		<p>The bucking is also a task sometimes associated with the harvesting. This is the cutting of the logs into smaller pieces that are then used in industrial processing. Due to its impact on the final product, and because it is an irreversible process, good planning should be performed, preferably integrated into the remainder supply chain planning (<xref ref-type="bibr" rid="CIT0023">Dems <italic>et al.</italic>, 2013</xref>).</p>
		<p>Transportation cost represents a significant parcel in the supply chain total cost (<xref ref-type="bibr" rid="CIT0075">Rönnqvist <italic>et al.</italic>, 1998</xref>; <xref ref-type="bibr" rid="CIT0027">Forsberg <italic>et al.</italic>, 2005</xref>; <xref ref-type="bibr" rid="CIT0017">Carlsson &amp; Rönnqvist, 2007</xref>). Since the 90’s, this issue has becoming more relevant in forest sector companies, namely the control and scheduling quality of transportation systems (<xref ref-type="bibr" rid="CIT0033">Hachemi <italic>et al.</italic>, 2008</xref>; <xref ref-type="bibr" rid="CIT0034">Hachemi <italic>et al.</italic>, 2011</xref>; <xref ref-type="bibr" rid="CIT0035">Hachemi <italic>et al.</italic>, 2013</xref>). This process planning is performed from the supply points, i.e., forest areas or terminals, to the demand points as paper mills, pulp, saw, heating plants or terminals (<xref ref-type="bibr" rid="CIT0017">Carlsson &amp; Rönnqvist, 2007</xref>). Therefore, the existence of an efficient road network affects the performance of the forest industry (<xref ref-type="bibr" rid="CIT0040">Henningsson <italic>et al.</italic>, 2007</xref>). This problem is similar to the problem VRP (Vehicle Routing Problem) (<xref ref-type="bibr" rid="CIT0017">Carlsson &amp; Rönnqvist, 2007</xref>).</p>
		<p>The different levels of planning imply different decisions on transportation. At the operational level are often determined the individual routes of trucks, and backhauling decisions if existent (<xref ref-type="bibr" rid="CIT0017">Carlsson &amp; Rönnqvist, 2007</xref>). This possibility of backhauling (see <xref ref-type="fig" rid="F0004">Figure 4</xref>) is an influence factor on transportation cost (<xref ref-type="bibr" rid="CIT0015">Carlgren <italic>et al.</italic>, 2006</xref>). Through backhauling, instead of trucks make the return trip empties, and therefore with low efficiency, are found new charge points in the opposite direction increasing the load on its total trip (<xref ref-type="bibr" rid="CIT0065">Palander &amp; Väätäinen, 2005</xref>; <xref ref-type="bibr" rid="CIT0017">Carlsson &amp; Rönnqvist, 2007</xref>). However, backhauling possibilities are usually limited in forest (<xref ref-type="bibr" rid="CIT0027">Forsberg <italic>et al.</italic>, 2005</xref>).</p>
		<fig id="F0004">
					<label>Figure 4.</label>
					<caption>
						<title>Transport possibilities: direct flow and backhauling (adapted from <xref ref-type="bibr" rid="CIT0015">Carlgren <italic>et al.</italic>, 2006</xref>).</title>
					</caption>
					<graphic xlink:href="forest_e039_f04.jpg" xmlns:xlink="http://www.w3.org/1999/xlink"/>
	</fig>
		<p>Also, it must be referred that there are two types of trucks, with and without crane. The main difference is that trucks without crane need other equipment to load and unload (<xref ref-type="bibr" rid="CIT0012">Bredström &amp; Rönnqvist, 2008</xref>). Thus, the occupation of the loaders when trucks arrive can be another cause of delay in transportation. Consequently, the truck has to wait implying higher transportation costs (<xref ref-type="bibr" rid="CIT0033">Hachemi <italic>et al.</italic>, 2008</xref>). Rather, trucks with crane can manage these tasks autonomously. However, the crane weight withdraws from 5 to 10 % load carrying capacity (<xref ref-type="bibr" rid="CIT0012">Bredström &amp; Rönnqvist, 2008</xref>). In addition, different materials have different densities and hence different weights. These factors will influence the amount of wood transported by a truck and consequently the cost of transportation (<xref ref-type="bibr" rid="CIT0015">Carlgren <italic>et al.</italic>, 2006</xref>).</p>
		<p>Although the transport is usually driven by trucks, in cases where the distances between supply and demand points are high, can be economically advantageous to use other means of transportation, such as train or ship. Still, the first part of the transport is done by trucks since the trains and ships collection points are fixed (<xref ref-type="bibr" rid="CIT0027">Forsberg <italic>et al.</italic>, 2005</xref>).</p>
		<p>It should be noted that although the described processes are transversal to the various branches of the forest supply chain, some processes, and specific considerations have to be included in particularized situations. For example for the pulp and paper industry other aspects must be considered such as the wood fibre (<xref ref-type="bibr" rid="CIT0015">Carlgren <italic>et al.</italic>, 2006</xref>). In turn, in the biomass sector the chipping process should also be treated, which consists in the wood logs and harvest residues conversion in small pieces to be used, for instance, in power plants or heating plants.</p>
		</sec>
		<sec id="S4">
			<title>MPC applied to forest-based supply chain</title>
			<p>As stated in section 3, forest supply chain is complex since it generates a wide variety of products, integrates several processes and entities and attends to several problems of management and planning.</p>
			<p>Although not known by the authors the application of control techniques, namely MPC, in this supply chain, the reviewed and discussed literature in section 2 shows the potential of this methodology for the forest supply chain management. Therefore, it is proposed the integration of MPC in the forestry industry, particularizing its implementation for a use case on biomass supply chain.</p>
			<sec id="S4.1">
				<title>Use Case</title>
				<p>This use case is integrated into the FOCUS (Advances in Forestry Control and aUtomation Systems in Europe) project. FOCUS is a 7 FP SME-target collaborative RTD project which objective is to “improve sustainability, productivity, and product marketability of forest-based value chains through an innovative technological platform for integrated planning and control of the whole tree-to-product operations, used by forest-producers to industry players” (www.focusnet.eu).</p>
		<p>Within the FOCUS project, are involved the development and integration of several components, namely the planning, control, sensors, among others, showed in <xref ref-type="fig" rid="F0005">Figure 5</xref>, connected through a central component denominated FOCUS Core.</p>
		<fig id="F0005">
					<label>Figure 5.</label>
					<caption>
						<title>Components of the FOCUS architecture.</title>
					</caption>
					<graphic xlink:href="forest_e039_f05.jpg" xmlns:xlink="http://www.w3.org/1999/xlink"/>
	</fig>
		<p>This European project encompasses four pilot cases, covering the supply chains of lumber, pulpwood, biomass and cork transformation. In particular, pilot case II, described in this work, is named “Control of biomass and transportation to energy conversion sites”. It is located in Finland and involves a local company, which main objective is to optimize chips delivery in power plants aiming energy production.</p>
		<p>Although biomass supply chain involves several processes as described in section 3, this pilot case will focus on the chipping and transportation processes, as depicted in <xref ref-type="fig" rid="F0006">Figure 6</xref>. The overall problem consists in wood logs transformation into chips by the chipping process and their subsequent transport to the power plants by trucks, for posterior energy production. The chips are directly loaded on trucks during the chipping process. In this context, may be involved several stands, with several piles each and several power plants. In a normal daily scenario can be considered about 1-6 chipping sites, 11 chippers, 20 trucks and 10 power plants. Each power plant demands the intended MWh on a weekly basis, and may also impose a daily minimum. It should be noted that the conversion of m<sup>3</sup> to MWh depends on the material density and wood moisture content. However, the moisture content of the wood pile is normally an unknown parameter. This parameter can be measured using sensors, which is a task associated with one of the work packages of the FOCUS project, or can be estimated through models, which depend on different factors, such as wood type, weather, among others, as presented in <xref ref-type="disp-formula" rid="form0001">equation (1)</xref>. In our case, the actual measurement of the moisture content is performed upon material reception at the mill. At the piles the moisture content is inferred from a model.</p>
		<graphic id="form0001" xlink:href="forest_e039_form1.jpg" xmlns:xlink="http://www.w3.org/1999/xlink"/>
	<fig id="F0006">
					<label>Figure 6.</label>
					<caption>
						<title>Considered processes in pilot case II.</title>
					</caption>
					<graphic xlink:href="forest_e039_f06.jpg" xmlns:xlink="http://www.w3.org/1999/xlink"/>
	</fig>
		<p><xref ref-type="fig" rid="F0007">Figure 7</xref> presents the proposed control methodology. Considering the forest supply chain and the concept of MPC, the applied methodology will consist on the modelling of the processes through dynamic models that adequately describe the system behaviour, with information sharing across the whole system. This is because the processes are interdependent, and the one’s results have influence on other processes results, and so in the entire supply chain.</p>
					<fig id="F0007">
					<label>Figure 7.</label>
					<caption>
						<title>Proposed control methodology.</title>
					</caption>
					<graphic xlink:href="forest_e039_f07.jpg" xmlns:xlink="http://www.w3.org/1999/xlink"/>
	</fig>
		<p>The implementation of MPC in this pilot case also includes the coordination between the planning and control levels. Namely, the planning level involves two planning sub-levels, the tactical and the operational. The tactical level aims to maximize the net profit and, in this sense, define the number of equipment (chippers and trucks) needed to accomplish with the power plant demand. On the other hand, the operational level is responsible for the routing and scheduling of chippers and trucks in a synchronized manner, considering the minimization of operational costs, such as vehicles utilizations, distances, waiting times, fuel consumption, among other factors.</p>
		<p>As previously mentioned the power plant demand consists in a quantity of wood material in MWh, constrained to moisture content thresholds and time windows in which the power plants accept the delivery of material. Chippers’ and trucks’ schedules, as well as the planned flows for the day, are used as inputs for the control level, which will verify if the plan is still able to be respected and react according that result. In detail, three control situations may occur: if the current state of the system is favourable to satisfy the plan within certain pre-defined limits, the initial control actions will be maintained; if the control detects the need to readjust the system, then actions related with schedules and tasks are directly performed to accomplish the plan; however, if these adjustments involve major changes in the system such as the hiring of new resources, the control will send an alert to the upper level of planning that will decide on the implementation of the suggested changes. Therefore, the coordination of planning and control levels will enable to plan the chipping and transportation processes and to insure the timely response to disturbances such as breakdowns of equipment and delays.</p>
		<p>The initial operational plan provided by the planning level considers the synchronized routing and scheduling of chippers and trucks for a working day. In this way, it consists in a table with the tasks and schedules of chippers and trucks, indicating the origin and destination nodes with the corresponding loading and unloading services, as exemplified in <xref ref-type="fig" rid="F0008">Figure 8</xref> for a small dimensional problem with two chippers, four trucks and six power plants. In this figure “p” represents the pile, “c” the client, in this case the power plant, and “d” the loading and unloading services at piles and clients, respectively. The “t” regards the terminal, at which the equipment stands during the non-working period. To illustrate the information concerning this initial operational plan, the “p2d1”, marked with a circle in <xref ref-type="fig" rid="F0008">Figure 8</xref>, regards the first loading service in pile 2 performed by the truck 3 at time instant 195.</p>
			<fig id="F0008">
					<label>Figure 8.</label>
					<caption>
						<title>Example of an initial operational plan provided by the planning level.</title>
					</caption>
					<graphic xlink:href="forest_e039_f08.jpg" xmlns:xlink="http://www.w3.org/1999/xlink"/>
	</fig>
		<p>As depicted in <xref ref-type="fig" rid="F0007">Figure 7</xref>, the information contained in this plan is loaded to the optimizer. In the case of disturbances, such as breakdowns, delays, bad weather conditions, etc., which imply the deviation or failure of the daily plan, the optimizer will compute the next control actions to be implemented in the processes in order to accomplish the initial plan. For instance in the occurrence of a truck breakdown, the optimizer can change the other trucks schedules and tasks to cover that truck work, without change the initial resources pool. The used optimization algorithm can be performed using techniques such as PSO or Genetic Algorithms, which is a method for solving optimization problems based on natural selection of organisms. In this technique, the optimization is based on concepts such as the evolution and the survival of the fittest organism.</p>
		<p>Also, an essential component of the MPC are the predictive models, in our case concerning the chipping and transportation processes. With these models, the controller will be able to forecast the behaviour of the system based on the current state provided by the sensors. Due to the nature of the biomass supply chain, models will be based on Discret-Event Simulation (DES). In this technique, the systems are modelled through sets of queues and activities, and the changes in states are dependent on the occurrence of events at discrete points of time, such as, for our case, the truck’s loading or unloading, the start of chipping, etc. The models were developed using a discrete-event simulation tool.</p>
		<p>The predictive models will be used by the optimizer in the minimization of a specific cost function. This cost function consists in an estimation of the waiting and transportation times which are related with the operational costs, as represented in <xref ref-type="disp-formula" rid="form0002">equation (2)</xref>. In this sense, in a first instance if the verified disturbance consists in a delay, the algorithm will try to adapt the schedules or send alert to the planning level in order to comply with the daily deliveries to the power plants, at the lowest cost, i.e., minimizing the total trucks transportation time, the total chippers transportation time, and the total chipping time. However, if the disturbance consists in equipment malfunctioning and severe weather conditions, the algorithm will reallocate the tasks for that day, always aiming the chips delivery at the lowest cost.</p>
		<graphic id="form0002" xlink:href="forest_e039_form2.jpg" xmlns:xlink="http://www.w3.org/1999/xlink"/>
		<p>Subject to:</p>
		<p>
			<italic>V</italic> ≤ maximum number of trucks defined by planning</p>
		<p>
			<italic>K</italic> ≤ maximum number of chippers defined by planning</p>
		<p>Where:</p>
		<p>
			<italic>w</italic>
			<sub><italic>vp</italic></sub> = waiting time of truck <italic>v</italic> in pile <italic>p</italic>
		</p>
		<p>
			<italic>w</italic>
			<sub><italic>vc</italic></sub> = waiting time of truck <italic>v</italic> in client <italic>c</italic>
		</p>
		<p>
			<italic>t</italic>
			<sub><italic>v</italic></sub> = transportation time of truck <italic>v</italic>
		</p>
		<p>
			<italic>t</italic>
			<sub><italic>k</italic></sub>
			<italic> = </italic>chipping time of chipper<italic> k</italic>
		</p>
		<p>
			<italic>V </italic>= set of <italic>v</italic> trucks</p>
		<p>
			<italic>K</italic> = set of <italic>k</italic> chippers</p>
			</sec>
		</sec>
		<sec id="S5">
			<title>Conclusions</title>
			<p>Model Predictive Control has proved to be a successful technique in the process control applications. In this paper, it is provided an overview of its application as a management tool for supply chains. The mentioned works have demonstrated economic benefits for the involved partners through the MPC use since it enables the global performance optimization even in the presence of uncertainties and disturbances. Despite these facts, and as far as we know, MPC application is inexistent in the forest-based supply chain. This work has described the generic characteristics of the forest supply chain, and proposed the application of MPC in this area, in coordination with the planning level. The advantages of the proposed method were presented regarding a use case in the biomass supply chain. Therefore, by integrating planning and MPC, it will be possible to plan in a properly manner the involved processes, in this case the chipping and transportation, and respond in time to critical events and disturbances such as equipment’s breakdowns or delays. At the present a set of tests is being conducted to evaluate the performance of the proposed methodology and, if required, redesign and/or tune the models and the optimization algorithms. From the performed simulations, it is possible to know in advance the impact of the occurrence of disturbances in the supply chain. This is a major contribution since it enables to correct beforehand or alert the planning level to generate a new plan.</p>
		</sec>
	</body>
	<back>
		<ack id="S6">
		<title>Acknowledgements</title>
		<p>The authors wish to acknowledge the contributions of the members of the FOCUS consortium, in particular those involved in the collection of information in the pilot case II: Jussi Rasinmäki and Dmitry Podkopaev from Simosol Oy, Finland; Bruno Oliveira and Alexandra Marques from INESC TEC, Portugal.</p>
		</ack>	
		<ref-list id="S7">
			<title >References</title>
		<ref id="CIT0001">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Al-e-Hashem</surname>
				<given-names>SMJM</given-names>
			</name>
			<name>
				<surname>Aryanezhad</surname>
				<given-names>MB</given-names>
			</name>
			<name>
				<surname>Sadjadi</surname>
				<given-names>SJ</given-names>
			</name>
			</person-group>
			<article-title>An efficient algorithm to solve a multi-objective robust aggregate production planning in an uncertain environment</article-title>
			<source>Int J Adv Manuf Tech</source>
			<year>2012</year>
			<volume>58</volume>
			<issue>5-8</issue>
			<fpage>765</fpage>
			<lpage>782</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1007/s00170-011-3396-1">http://dx.doi.org/10.1007/s00170-011-3396-1</ext-link></comment>
			</element-citation>
</ref>
		<ref id="CIT0002">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Alessandri</surname>
				<given-names>A</given-names>
			</name>
			<name>
				<surname>Gaggero</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Tonelli</surname>
				<given-names>F</given-names>
			</name>
			</person-group>
			<article-title>Min-Max and Predictive Control for the Management of Distribution in Supply Chains</article-title>
			<source>IEEE Transactions on Control Systems Technology</source>
			<year>2011</year>
			<volume>19</volume>
			<issue>5</issue>
			<fpage>1075</fpage>
			<lpage>1089</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1109/TCST.2010.2076283">http://dx.doi.org/10.1109/TCST.2010.2076283</ext-link></comment>
			</element-citation>
</ref>
		<ref id="CIT0003">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Alonso-Ayuso</surname>
				<given-names>A</given-names>
			</name>
			<name>
				<surname>Escudero</surname>
				<given-names>LF</given-names>
			</name>
			<name>
				<surname>Guignard</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Quinteros</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Weintraub</surname>
				<given-names>A</given-names>
			</name>
			</person-group>
			<article-title>Forestry management under uncertainty</article-title>
			<source>Ann Oper Res</source>
			<year>2011</year>
			<volume>190</volume>
			<fpage>17</fpage>
			<lpage>39</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1007/s10479-009-0561-0">http://dx.doi.org/10.1007/s10479-009-0561-0</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0004">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Badole</surname>
				<given-names>CM</given-names>
			</name>
			<name>
				<surname>Jain</surname>
				<given-names>R</given-names>
			</name>
			<name>
				<surname>Rathore</surname>
				<given-names>AP</given-names>
			</name>
			<name>
				<surname>Nepal</surname>
				<given-names>B</given-names>
			</name>
			</person-group>
			<article-title>Research and Opportunities in Supply Chain Modeling: A Review</article-title>
			<source>Int J Sup Chain Mgt</source>
			<year>2012</year>
			<volume>1</volume>
			<issue>3</issue>
			<fpage>63</fpage>
			<lpage>86</lpage>
			</element-citation>		
</ref>
		<ref id="CIT0005">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Beaudoin</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>LeBel</surname>
				<given-names>L</given-names>
			</name>
			<name>
				<surname>Frayret</surname>
				<given-names>J-M</given-names>
			</name>
			</person-group>
			<article-title>Tactical supply chain planning in the forest products industry through optimization and scenario-based analysis</article-title>
			<source>Can J For Res</source>
			<year>2007</year>
			<volume>37</volume>
			<fpage>128</fpage>
			<lpage>140</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1139/x06-223">http://dx.doi.org/10.1139/x06-223</ext-link></comment>
			</element-citation>
</ref>
		<ref id="CIT0006">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Beaudoin</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Frayret</surname>
				<given-names>J-M</given-names>
			</name>
			<name>
				<surname>LeBel</surname>
				<given-names>L</given-names>
			</name>
			</person-group>
			<article-title>Hierarchical forest management with anticipation: an application to tactical-operational planning integration</article-title>
			<source>Can J For Res</source>
			<year>2008</year>
			<volume>38</volume>
			<fpage>2198</fpage>
			<lpage>2211</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1139/X08-055">http://dx.doi.org/10.1139/X08-055</ext-link></comment>
			</element-citation>
</ref>
		<ref id="CIT0007">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Beaudoin</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Frayret</surname>
				<given-names>J-M</given-names>
			</name>
			<name>
				<surname>LeBel</surname>
				<given-names>L</given-names>
			</name>
			</person-group>
			<article-title>Negotiation-based distributed wood procurement planning within a multi-firm environment</article-title>
			<source>Forest Policy and Economics</source>
			<year>2010</year>
			<volume>12</volume>
			<fpage>79</fpage>
			<lpage>93</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.forpol.2009.07.007">http://dx.doi.org/10.1016/j.forpol.2009.07.007</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0008">
		<element-citation publication-type="book">
			<person-group person-group-type="author">
			<name>
				<surname>Blanco</surname>
				<given-names>A</given-names>
			</name>
			<name>
				<surname>Masini</surname>
				<given-names>G</given-names>
			</name>
			<name>
				<surname>Petracci</surname>
				<given-names>N</given-names>
			</name>
			<name>
				<surname>Bandoni</surname>
				<given-names>A</given-names>
			</name>
			</person-group>
			<article-title>Model Predictive Control Based Planning in the Fruit Industry</article-title>
			<year>2008</year>
			<conf-name>18th European Symposium on Computer Aided Process Engineering – ESCAPE 18</conf-name>
			<fpage>1</fpage>
			<lpage>6</lpage>
			</element-citation>
</ref>
		<ref id="CIT0009">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Bose</surname>
				<given-names>S</given-names>
			</name>
			<name>
				<surname>Pekny</surname>
				<given-names>JF</given-names>
			</name>
			</person-group>
			<article-title>A model predictive framework for planning and scheduling problems: a case study of consumer goods supply chain</article-title>
			<source>Computers and Chemical Engineering</source>
			<year>2000</year>
			<volume>24</volume>
			<fpage>329</fpage>
			<lpage>335</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/S0098-1354(00)00469-5">http://dx.doi.org/10.1016/S0098-1354(00)00469-5</ext-link></comment>
			</element-citation>
</ref>
		<ref id="CIT0010">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Braun</surname>
				<given-names>MW</given-names>
			</name>
			<name>
				<surname>Rivera</surname>
				<given-names>DE</given-names>
			</name>
			<name>
				<surname>Flores</surname>
				<given-names>ME</given-names>
			</name>
			<name>
				<surname>Carlyle</surname>
				<given-names>WM</given-names>
			</name>
			<name>
				<surname>Kempf</surname>
				<given-names>KG</given-names>
			</name>
			</person-group>
			<article-title>A Model Predictive Control framework for robust management of multi-product, multi-echelon demand networks</article-title>
			<source>Annual Reviews in Control</source>
			<year>2003</year>
			<volume>27</volume>
			<fpage>229</fpage>
			<lpage>245</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.arcontrol.2003.09.006">http://dx.doi.org/10.1016/j.arcontrol.2003.09.006</ext-link></comment>
			</element-citation>
</ref>
		<ref id="CIT0011">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Bredström</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Lundgren</surname>
				<given-names>JT</given-names>
			</name>
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Carlsson</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Mason</surname>
				<given-names>A</given-names>
			</name>
			</person-group>
			<article-title>Supply chain optimization in the pulp mill industry – IP models, column generation and novel constraint branches</article-title>
			<source>Eur J Oper Res</source>
			<year>2004</year>
			<volume>156</volume>
			<fpage>2</fpage>
			<lpage>22</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.ejor.2003.08.001">http://dx.doi.org/10.1016/j.ejor.2003.08.001</ext-link></comment>
			</element-citation>
</ref>
		<ref id="CIT0012">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Bredström</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			</person-group>
			<article-title>Combined vehicle routing and scheduling with temporal precedence and synchronization constraints</article-title>
			<source>Eur J Oper Res</source>
			<year>2008</year>
			<volume>191</volume>
			<fpage>19</fpage>
			<lpage>31</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.ejor.2007.07.033">http://dx.doi.org/10.1016/j.ejor.2007.07.033</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0013">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Brumelle</surname>
				<given-names>S</given-names>
			</name>
			<name>
				<surname>Granot</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Halme</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Vertinsky</surname>
				<given-names>I</given-names>
			</name>
			</person-group>
			<article-title>A tabu search algorithm for finding good harvest schedules satisfying green-up constraints</article-title>
			<source>Eur J Oper Res</source>
			<year>1998</year>
			<volume>106</volume>
			<fpage>408</fpage>
			<lpage>424</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/S0377-2217(97)00282-8">http://dx.doi.org/10.1016/S0377-2217(97)00282-8</ext-link></comment>
			</element-citation>
</ref>
		<ref id="CIT0014">
<element-citation publication-type="book">
			<person-group person-group-type="author">
			<name>
				<surname>Camacho</surname>
				<given-names>EF</given-names>
			</name>
			<name>
				<surname>Bordons</surname>
				<given-names>C</given-names>
			</name>
			</person-group>
			<source>Model Predictive Control</source>
			<year>2007</year>
			<publisher-name>Springer-Verlag</publisher-name>
			<publisher-loc>London</publisher-loc>
			<edition>2</edition>
			<size units="pages">405</size>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1007/978-0-85729-398-5">http://dx.doi.org/10.1007/978-0-85729-398-5</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0015">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Carlgren</surname>
				<given-names>C-G</given-names>
			</name>
			<name>
				<surname>Carlsson</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			</person-group>
			<article-title>Log sorting in forest harvest areas integrated with transportation planning using backhauling</article-title>
			<source>Scand J Forest Res</source>
			<year>2006</year>
			<volume>21</volume>
			<fpage>260</fpage>
			<lpage>271</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1080/02827580600739021">http://dx.doi.org/10.1080/02827580600739021</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0016">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Carlsson</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			</person-group>
			<article-title>Supply chain management in forestry – case studies at Södra Cell AB</article-title>
			<source>Eur J Oper Res</source>
			<year>2005</year>
			<volume>163</volume>
			<fpage>589</fpage>
			<lpage>616</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.ejor.2004.02.001">http://dx.doi.org/10.1016/j.ejor.2004.02.001</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0017">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Carlsson</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			</person-group>
			<article-title>Backhauling in forest transportation: models, methods, and practical usage</article-title>
			<source>Can J For Res</source>
			<year>2007</year>
			<volume>37</volume>
			<fpage>2612</fpage>
			<lpage>2623</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1139/X07-106">http://dx.doi.org/10.1139/X07-106</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0018">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Cea</surname>
				<given-names>C</given-names>
			</name>
			<name>
				<surname>Jofré</surname>
				<given-names>A</given-names>
			</name>
			</person-group>
			<article-title>Linking strategic and tactical forestry planning decisions</article-title>
			<source>Ann Oper Res</source>
			<year>2000</year>
			<volume>95</volume>
			<fpage>131</fpage>
			<lpage>158</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1023/A:1018978813833">http://dx.doi.org/10.1023/A:1018978813833</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0019">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Chauhan</surname>
				<given-names>SS</given-names>
			</name>
			<name>
				<surname>Frayret</surname>
				<given-names>J-M</given-names>
			</name>
			<name>
				<surname>LeBel</surname>
				<given-names>L</given-names>
			</name>
			</person-group>
			<article-title>Multi-commodity supply network planning in the forest supply chain</article-title>
			<source>Eur J Oper Res</source>
			<year>2009</year>
			<volume>196</volume>
			<fpage>688</fpage>
			<lpage>696</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.ejor.2008.03.024">http://dx.doi.org/10.1016/j.ejor.2008.03.024</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0020">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Chauhan</surname>
				<given-names>SS</given-names>
			</name>
			<name>
				<surname>Frayret</surname>
				<given-names>J-M</given-names>
			</name>
			<name>
				<surname>LeBel</surname>
				<given-names>L</given-names>
			</name>
			</person-group>
			<article-title>Supply network planning in the forest supply chain with bucking decisions anticipation</article-title>
			<source>Ann Oper Res</source>
			<year>2011</year>
			<volume>190</volume>
			<fpage>93</fpage>
			<lpage>115</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1007/s10479-009-0621-5">http://dx.doi.org/10.1007/s10479-009-0621-5</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0021">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Church</surname>
				<given-names>RL</given-names>
			</name>
			<name>
				<surname>Murray</surname>
				<given-names>AT</given-names>
			</name>
			<name>
				<surname>Figueroa</surname>
				<given-names>MA</given-names>
			</name>
			<name>
				<surname>Barber</surname>
				<given-names>KH</given-names>
			</name>
			</person-group>
			<article-title>Support system development for forest ecosystem management</article-title>
			<source>Eur J Oper Res</source>
			<year>2000</year>
			<volume>121</volume>
			<fpage>247</fpage>
			<lpage>258</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/S0377-2217(99)00215-5">http://dx.doi.org/10.1016/S0377-2217(99)00215-5</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0022">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Clark</surname>
				<given-names>MM</given-names>
			</name>
			<name>
				<surname>Meller</surname>
				<given-names>RD</given-names>
			</name>
			<name>
				<surname>McDonald</surname>
				<given-names>TP</given-names>
			</name>
			<name>
				<surname>Ting</surname>
				<given-names>CC</given-names>
			</name>
			</person-group>
			<article-title>A new harvest operation cost model to evaluate forest harvest layout alternatives</article-title>
			<source>Ann Oper Res</source>
			<year>2000</year>
			<volume>95</volume>
			<fpage>115</fpage>
			<lpage>129</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1023/A:1018914527037">http://dx.doi.org/10.1023/A:1018914527037</ext-link></comment>
			</element-citation>
</ref>
		<ref id="CIT0023">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Dems</surname>
				<given-names>A</given-names>
			</name>
			<name>
				<surname>Rousseau</surname>
				<given-names>L-M</given-names>
			</name>
			<name>
				<surname>Frayret</surname>
				<given-names>J-M</given-names>
			</name>
			</person-group>
			<article-title>Effects of different cut-to-length harvesting structures on the economic value of a wood procurement planning problem</article-title>
			<source>Ann Oper Res</source>
			<year>2013</year>
			<issue>1</issue>
			<size units="pages">22</size>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1007/s10479-013-1336-1">http://dx.doi.org/10.1007/s10479-013-1336-1</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0024">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Doganis</surname>
				<given-names>P</given-names>
			</name>
			<name>
				<surname>Aggelogiannaki</surname>
				<given-names>E</given-names>
			</name>
			<name>
				<surname>Sarimveis</surname>
				<given-names>H</given-names>
			</name>
			</person-group>
			<article-title>A Model Predictive Control and Time Series Forecasting Framework for Supply Chain Management. World Academy of Science</article-title>
			<source>Engineering and Technology</source>
			<year>2008</year>
			<volume>15</volume>
			<fpage>766</fpage>
			<lpage>770</lpage>
			</element-citation>		
</ref>
		<ref id="CIT0025">
		<element-citation publication-type="conf-proc">
			<person-group person-group-type="author">
			<name>
				<surname>Dunbar</surname>
				<given-names>WB</given-names>
			</name>
			<name>
				<surname>Desa</surname>
				<given-names>S</given-names>
			</name>
			</person-group>
			<article-title>Distributed Model Predictive Control for Dynamic Supply Chain Management</article-title>
			<year>2005</year>
			<conf-name>Proceedings of the Int. Workshop on Assessment and Future Directions of Nonlinear MPC</conf-name>
			<fpage>1</fpage>
			<lpage>10</lpage>
			</element-citation>
</ref>
		<ref id="CIT0026">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Eshlaghy</surname>
				<given-names>AT</given-names>
			</name>
			<name>
				<surname>Razavi</surname>
				<given-names>M</given-names>
			</name>
			</person-group>
			<article-title>Modeling and Simulating Supply Chain Management</article-title>
			<source>Applied Mathematical Sciences</source>
			<year>2011</year>
			<volume>5</volume>
			<issue>17</issue>
			<fpage>817</fpage>
			<lpage>828</lpage>
			</element-citation>		
</ref>
		<ref id="CIT0027">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Forsberg</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Frisk</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			</person-group>
			<article-title>FlowOpt – a decision support tool for strategic and tactical transportation planning in forestry</article-title>
			<source>Int J For Eng</source>
			<year>2005</year>
			<volume>16</volume>
			<issue>2</issue>
			<fpage>101</fpage>
			<lpage>114</lpage>
			</element-citation>		
</ref>
		<ref id="CIT0028">
<element-citation publication-type="conf-proc">
			<person-group person-group-type="author">
			<name>
				<surname>Fu</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Ionescu</surname>
				<given-names>CM</given-names>
			</name>
			<name>
				<surname>Aghezzaf</surname>
				<given-names>E-H</given-names>
			</name>
			<name>
				<surname>Keyser</surname>
				<given-names>RD</given-names>
			</name>
			</person-group>
			<article-title>A Centralized Model Predictive Control Strategy for Dynamic Supply Chain Management</article-title>
			<year>2013</year>
			<conf-name>2013 IFAC Conference on Manufacturing Modelling, Management, and Control</conf-name>
			<conf-loc>Saint Petersburg, Russia</conf-loc>
			<conf-date>June 19-21</conf-date>
			<fpage>1630</fpage>
			<lpage>1635</lpage>
			</element-citation>		
</ref>
		<ref id="CIT0029">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Fu</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Aghezzaf</surname>
				<given-names>E-H</given-names>
			</name>
			<name>
				<surname>Keyser</surname>
				<given-names>RD</given-names>
			</name>
			</person-group>
			<article-title>A model predictive control framework for centralised management of a supply chain dynamical system</article-title>
			<source>Systems Science &amp; Control Engineering: An Open Access Journal</source>
			<year>2014</year>
			<volume>2</volume>
			<fpage>250</fpage>
			<lpage>260</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1080/21642583.2014.895449">http://dx.doi.org/10.1080/21642583.2014.895449</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0030">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Goycoolea</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Murray</surname>
				<given-names>AT</given-names>
			</name>
			<name>
				<surname>Barahona</surname>
				<given-names>F</given-names>
			</name>
			<name>
				<surname>Epstein</surname>
				<given-names>R</given-names>
			</name>
			<name>
				<surname>Weintraub</surname>
				<given-names>A</given-names>
			</name>
			</person-group>
			<article-title>Harvest Scheduling Subject to Maximum Area Restrictions: Exploring Exact Approaches</article-title>
			<source>Operations Research</source>
			<year>2005</year>
			<volume>53</volume>
			<issue>3</issue>
			<fpage>490</fpage>
			<lpage>500</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1287/opre.1040.0169">http://dx.doi.org/10.1287/opre.1040.0169</ext-link></comment>
			</element-citation>
</ref>
		<ref id="CIT0031">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Guinard</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Ryu</surname>
				<given-names>C</given-names>
			</name>
			<name>
				<surname>Spielberg</surname>
				<given-names>K</given-names>
			</name>
			</person-group>
			<article-title>Model tightening for integrated timber harvest and transportation planning</article-title>
			<source>Eur J Oper Res</source>
			<year>1998</year>
			<volume>111</volume>
			<fpage>448</fpage>
			<lpage>460</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/S0377-2217(97)00362-7">http://dx.doi.org/10.1016/S0377-2217(97)00362-7</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0032">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Gunn</surname>
				<given-names>EA</given-names>
			</name>
			<name>
				<surname>Richards</surname>
				<given-names>EW</given-names>
			</name>
			</person-group>
			<article-title>Solving the adjacency problem with stand-centred constraints</article-title>
			<source>Can J For Res</source>
			<year>2005</year>
			<volume>35</volume>
			<fpage>832</fpage>
			<lpage>842</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1139/x05-013">http://dx.doi.org/10.1139/x05-013</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0033">
<element-citation publication-type="book">
			<person-group person-group-type="author">
			<name>
				<surname>Hachemi</surname>
				<given-names>NE</given-names>
			</name>
			<name>
				<surname>Gendreau</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Rousseau</surname>
				<given-names>L-M</given-names>
			</name>
			</person-group>
			<person-group>
			<name>
				<surname>Perron</surname>
				<given-names>L</given-names>
			</name>
			<name>
				<surname>M</surname>
				<given-names>Trick</given-names>
			</name>
			</person-group>
			<chapter-title>Solving a Log-Truck Scheduling Problem with Constraint Programming</chapter-title>
			<source>CPAIOR 2008</source>
			<year>2008</year>
			<series>LNCS</series>
			<volume>5015</volume>
			<fpage>293</fpage>
			<lpage>297</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1007/978-3-540-68155-7_25">http://dx.doi.org/10.1007/978-3-540-68155-7_25</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0034">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Hachemi</surname>
				<given-names>NE</given-names>
			</name>
			<name>
				<surname>Gendreau</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Rousseau</surname>
				<given-names>L-M</given-names>
			</name>
			</person-group>
			<article-title>A hybrid constraint programming approach to the log-truck scheduling problem</article-title>
			<source>Ann Oper Res</source>
			<year>2011</year>
			<volume>184</volume>
			<fpage>163</fpage>
			<lpage>178</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1007/s10479-010-0698-x">http://dx.doi.org/10.1007/s10479-010-0698-x</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0035">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Hachemi</surname>
				<given-names>NE</given-names>
			</name>
			<name>
				<surname>Gendreau</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Rousseau</surname>
				<given-names>L-M</given-names>
			</name>
			</person-group>
			<article-title>A heuristic to solve the synchronized log-truck scheduling problem</article-title>
			<source>Computers &amp; Operations Research</source>
			<year>2013</year>
			<volume>40</volume>
			<fpage>666</fpage>
			<lpage>673</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.cor.2011.02.002">http://dx.doi.org/10.1016/j.cor.2011.02.002</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0036">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Hai</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Hao</surname>
				<given-names>Z</given-names>
			</name>
			<name>
				<surname>Ping</surname>
				<given-names>LY</given-names>
			</name>
			</person-group>
			<article-title>Model Predictive Control for inventory Management in Supply Chain Planning</article-title>
			<source>Procedia Engineering</source>
			<year>2011</year>
			<volume>15</volume>
			<fpage>1154</fpage>
			<lpage>1159</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.proeng.2011.08.213">http://dx.doi.org/10.1016/j.proeng.2011.08.213</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0037">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Han</surname>
				<given-names>H</given-names>
			</name>
			<name>
				<surname>Qiao</surname>
				<given-names>J</given-names>
			</name>
			</person-group>
			<article-title>Nonlinear Model-Predictive Control for Industrial Processes: An Application to Wastewater Treatment Process</article-title>
			<source>IEEE Transactions on Industrial Electronics</source>
			<year>2014</year>
			<volume>61</volume>
			<issue>4</issue>
			<fpage>1970</fpage>
			<lpage>1982</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1109/TIE.2013.2266086">http://dx.doi.org/10.1109/TIE.2013.2266086</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0038">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Heinimann</surname>
				<given-names>HR</given-names>
			</name>
			</person-group>
			<article-title>A concept in adaptive ecosystem management – An engineering perspective</article-title>
			<source>For Ecol Manag</source>
			<year>2010</year>
			<volume>259</volume>
			<fpage>848</fpage>
			<lpage>856</lpage>
			</element-citation>		
</ref>
		<ref id="CIT0039">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Heinonen</surname>
				<given-names>T</given-names>
			</name>
			<name>
				<surname>Pukkala</surname>
				<given-names>T</given-names>
			</name>
			</person-group>
			<article-title>A Comparison of One- and Two-Compartment Neighbourhoods in Heuristic Search with Spatial Forest Management Goals</article-title>
			<source>Silva Fennica</source>
			<year>2004</year>
			<volume>38</volume>
			<issue>3</issue>
			<fpage>319</fpage>
			<lpage>332</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.14214/sf.419">http://dx.doi.org/10.14214/sf.419</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0040">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Henningsson</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Karlsson</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			</person-group>
			<article-title>Optimization Models for Forest Road Upgrade Planning</article-title>
			<source>J Math Model Algor</source>
			<year>2007</year>
			<volume>6</volume>
			<fpage>3</fpage>
			<lpage>23</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1007/s10852-006-9047-0">http://dx.doi.org/10.1007/s10852-006-9047-0</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0041">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Huang</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Sarjoughian</surname>
				<given-names>HS</given-names>
			</name>
			<name>
				<surname>Wang</surname>
				<given-names>W</given-names>
			</name>
			<name>
				<surname>Godding</surname>
				<given-names>G</given-names>
			</name>
			<name>
				<surname>Rivera</surname>
				<given-names>DE</given-names>
			</name>
			<name>
				<surname>Kempf</surname>
				<given-names>KG</given-names>
			</name>
			<name>
				<surname>Mittelmann</surname>
				<given-names>H</given-names>
			</name>
			</person-group>
			<article-title>Simulation of Semiconductor Manufacturing Supply-Chain Systems With DEVS, MPC, and KIB</article-title>
			<source>IEEE Transactions on Semiconductor Manufacturing</source>
			<year>2009</year>
			<volume>22</volume>
			<issue>1</issue>
			<fpage>164</fpage>
			<lpage>174</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1109/TSM.2008.2011680">http://dx.doi.org/10.1109/TSM.2008.2011680</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0042">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Ivanov</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Dolgui</surname>
				<given-names>A</given-names>
			</name>
			<name>
				<surname>Sokolov</surname>
				<given-names>B</given-names>
			</name>
			</person-group>
			<article-title>Applicability of optimal control theory to adaptive supply chain planning and scheduling</article-title>
			<source>Ann Rev Control</source>
			<year>2012</year>
			<volume>36</volume>
			<fpage>73</fpage>
			<lpage>84</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.arcontrol.2012.03.006">http://dx.doi.org/10.1016/j.arcontrol.2012.03.006</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0043">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Janamanchi</surname>
				<given-names>B</given-names>
			</name>
			<name>
				<surname>Burns</surname>
				<given-names>JR</given-names>
			</name>
			</person-group>
			<article-title>Control Theory Concepts Applied to Retail Supply Chain: A System Dynamics Modeling Environment Study</article-title>
			<source>Model Simul Engineering</source>
			<year>2013</year>
			<volume>2013</volume>
			<fpage>1</fpage>
			<lpage>15</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1155/2013/421350">http://dx.doi.org/10.1155/2013/421350</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0044">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Kapsiotis</surname>
				<given-names>G</given-names>
			</name>
			<name>
				<surname>Tzafestas</surname>
				<given-names>S</given-names>
			</name>
			</person-group>
			<article-title>Decision making for inventory/production planning using model-based predictive control</article-title>
			<source>Parallel and distributed computing in engineering systems</source>
			<year>1992</year>
			<fpage>551</fpage>
			<lpage>556</lpage>
			</element-citation>
</ref>
		<ref id="CIT0045">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Karlsson</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Bergström</surname>
				<given-names>J</given-names>
			</name>
			</person-group>
			<article-title>Short-term harvest planning including scheduling of harvest crews</article-title>
			<source>Int Trans Op Res</source>
			<year>2003</year>
			<volume>10</volume>
			<fpage>413</fpage>
			<lpage>431</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1111/1475-3995.00419">http://dx.doi.org/10.1111/1475-3995.00419</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0046">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Karlsson</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Bergström</surname>
				<given-names>J</given-names>
			</name>
			</person-group>
			<article-title>An optimization model for annual harvest planning</article-title>
			<source>Can J For Res</source>
			<year>2004</year>
			<volume>34</volume>
			<fpage>1747</fpage>
			<lpage>1754</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1139/x04-043">http://dx.doi.org/10.1139/x04-043</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0047">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Kawtar</surname>
				<given-names>T</given-names>
			</name>
			<name>
				<surname>Said</surname>
				<given-names>A</given-names>
			</name>
			<name>
				<surname>Youssef</surname>
				<given-names>B</given-names>
			</name>
			</person-group>
			<article-title>Stochastic Model Predictive Control for optimization costs in multi-level supply chain</article-title>
			<source>Int J Computer Sci Issues</source>
			<year>2014</year>
			<volume>11</volume>
			<issue>1-2</issue>
			<fpage>28</fpage>
			<lpage>32</lpage>
			</element-citation>		
</ref>
		<ref id="CIT0048">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Laurikkala</surname>
				<given-names>H</given-names>
			</name>
			<name>
				<surname>Ketonen</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Suominen</surname>
				<given-names>S</given-names>
			</name>
			<name>
				<surname>Huttunen</surname>
				<given-names>P</given-names>
			</name>
			<name>
				<surname>Alaruka</surname>
				<given-names>J</given-names>
			</name>
			</person-group>
			<article-title>Demand estimation and dynamic modelling as timber products industry SCM tools</article-title>
			<source>World Congress</source>
			<year>2005</year>
			<volume>16</volume>
			<issue>1</issue>
			<fpage>1642</fpage>
			<lpage>1648</lpage>
			</element-citation>		
</ref>
		<ref id="CIT0049">
<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Lee</surname>
				<given-names>HL</given-names>
			</name>
			<name>
				<surname>Padmanabhan</surname>
				<given-names>V</given-names>
			</name>
			<name>
				<surname>Whang</surname>
				<given-names>S</given-names>
			</name>
			</person-group>
			<article-title>Information Distortion in a Supply Chain: The Bullwhip Effect</article-title>
			<source>Manag Sci</source>
			<year>1997</year>
			<volume>43</volume>
			<issue>4</issue>
			<fpage>546</fpage>
			<lpage>558</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1287/mnsc.43.4.546">http://dx.doi.org/10.1287/mnsc.43.4.546</ext-link></comment>
			</element-citation>		
</ref>
		<ref id="CIT0050">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Li</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Zhai</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Chen</surname>
				<given-names>Y</given-names>
			</name>
			<name>
				<surname>Liu</surname>
				<given-names>S</given-names>
			</name>
			</person-group>
			<article-title>System Dynamic Simulation Approach for Supply Chain with Capability Limit</article-title>
			<source>J Computers</source>
			<year>2010</year>
			<volume>5</volume>
			<issue>7</issue>
			<fpage>1125</fpage>
			<lpage>1132</lpage>
			</element-citation>
			</ref>
		<ref id="CIT0051">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Li</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Lin</surname>
				<given-names>Y</given-names>
			</name>
			<name>
				<surname>Jin</surname>
				<given-names>F</given-names>
			</name>
			</person-group>
			<article-title>A Supply Chain Simulation Model with Customer’s Satisfaction</article-title>
			<source>Int J Adv Computing Technol (IJACT)</source>
			<year>2012</year>
			<volume>4</volume>
			<issue>10</issue>
			<fpage>125</fpage>
			<lpage>132</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.4156/ijact.vol4.issue10.15">http://dx.doi.org/10.4156/ijact.vol4.issue10.15</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0052">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Li</surname>
				<given-names>X</given-names>
			</name>
			<name>
				<surname>Marlin</surname>
				<given-names>TE</given-names>
			</name>
			</person-group>
			<article-title>Robust supply chain performance via Model Predictive Control</article-title>
			<source>Computers Chemical Engineering</source>
			<year>2009</year>
			<volume>33</volume>
			<fpage>2134</fpage>
			<lpage>2143</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.compchemeng.2009.06.029">http://dx.doi.org/10.1016/j.compchemeng.2009.06.029</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0053">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Liu</surname>
				<given-names>G</given-names>
			</name>
			<name>
				<surname>Han</surname>
				<given-names>S</given-names>
			</name>
			<name>
				<surname>Zhao</surname>
				<given-names>X</given-names>
			</name>
			<name>
				<surname>Nelson</surname>
				<given-names>JD</given-names>
			</name>
			<name>
				<surname>Wang</surname>
				<given-names>H</given-names>
			</name>
			<name>
				<surname>Wang</surname>
				<given-names>W</given-names>
			</name>
			</person-group>
			<article-title>Optimisation algorithms for spatially constrained forest planning</article-title>
			<source>Ecological Modelling</source>
			<year>2006</year>
			<volume>194</volume>
			<fpage>421</fpage>
			<lpage>428</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.ecolmodel.2005.10.028">http://dx.doi.org/10.1016/j.ecolmodel.2005.10.028</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0054">
		<element-citation publication-type="conf-proc">
			<person-group person-group-type="author">
			<name>
				<surname>Maestre</surname>
				<given-names>JM</given-names>
			</name>
			<name>
				<surname>Peña</surname>
				<given-names>DM</given-names>
			</name>
			<name>
				<surname>Camacho</surname>
				<given-names>EF</given-names>
			</name>
			</person-group>
			<article-title>Distributed MPC: a supply chain case study</article-title>
			<conf-name>Joint 48th IEEE Conference on Decision and Control and 28th Chinese Control Conference</conf-name>
			<conf-loc>Shanghai, P.R. China</conf-loc>
			<conf-date>December 16-18</conf-date>
			<year>2009</year>
			<fpage>7099</fpage>
			<lpage>7104</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1109/cdc.2009.5400590">http://dx.doi.org/10.1109/cdc.2009.5400590</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0055">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Marshall</surname>
				<given-names>HD</given-names>
			</name>
			<name>
				<surname>Murphy</surname>
				<given-names>G</given-names>
			</name>
			<name>
				<surname>Boston</surname>
				<given-names>K</given-names>
			</name>
			</person-group>
			<article-title>Three Mathematical Models for Bucking-to-Order</article-title>
			<source>Silva Fennica</source>
			<year>2006</year>
			<volume>40</volume>
			<issue>1</issue>
			<fpage>127</fpage>
			<lpage>142</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.14214/sf.356">http://dx.doi.org/10.14214/sf.356</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0056">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Marques</surname>
				<given-names>AF</given-names>
			</name>
			<name>
				<surname>Borges</surname>
				<given-names>JG</given-names>
			</name>
			<name>
				<surname>Sousa</surname>
				<given-names>P</given-names>
			</name>
			<name>
				<surname>Pinho</surname>
				<given-names>AM</given-names>
			</name>
			</person-group>
			<article-title>An enterprise architecture approach to forest management support systems design: an application to pulpwood supply management in Portugal</article-title>
			<source>Eur J Forest Res</source>
			<year>2011</year>
			<volume>130</volume>
			<fpage>935</fpage>
			<lpage>948</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1007/s10342-011-0482-8">http://dx.doi.org/10.1007/s10342-011-0482-8</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0057">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Martins</surname>
				<given-names>I</given-names>
			</name>
			<name>
				<surname>Constantino</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Borges</surname>
				<given-names>JG</given-names>
			</name>
			</person-group>
			<article-title>A column generation approach for solving a non-temporal forest harvest model with spatial structure constraints</article-title>
			<source>Eur J Oper Res</source>
			<year>2005</year>
			<volume>161</volume>
			<fpage>478</fpage>
			<lpage>498</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.ejor.2003.07.021">http://dx.doi.org/10.1016/j.ejor.2003.07.021</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0058">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Mastragostino</surname>
				<given-names>R</given-names>
			</name>
			<name>
				<surname>Patel</surname>
				<given-names>S</given-names>
			</name>
			<name>
				<surname>Swartz</surname>
				<given-names>CLE</given-names>
			</name>
			</person-group>
			<article-title>Robust decision making for hybrid process supply chain systems via model predictive control</article-title>
			<source>Computers Chemical Engineering</source>
			<year>2014</year>
			<volume>62</volume>
			<fpage>37</fpage>
			<lpage>55</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.compchemeng.2013.10.019">http://dx.doi.org/10.1016/j.compchemeng.2013.10.019</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0059">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Mentzer</surname>
				<given-names>JT</given-names>
			</name>
			<name>
				<surname>DeWitt</surname>
				<given-names>W</given-names>
			</name>
			<name>
				<surname>Keebler</surname>
				<given-names>JS</given-names>
			</name>
			<name>
				<surname>Min</surname>
				<given-names>S</given-names>
			</name>
			<name>
				<surname>Nix</surname>
				<given-names>NW</given-names>
			</name>
			<name>
				<surname>Smith</surname>
				<given-names>CD</given-names>
			</name>
			<name>
				<surname>Zacharia</surname>
				<given-names>ZG</given-names>
			</name>
			</person-group>
			<article-title>Defining supply chain management</article-title>
			<source>J Business Logistics</source>
			<year>2001</year>
			<volume>22</volume>
			<issue>2</issue>
			<fpage>1</fpage>
			<lpage>25</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1002/j.2158-1592.2001.tb00001.x">http://dx.doi.org/10.1002/j.2158-1592.2001.tb00001.x</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0060">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Mestan</surname>
				<given-names>E</given-names>
			</name>
			<name>
				<surname>Türkay</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Arkun</surname>
				<given-names>Y</given-names>
			</name>
			</person-group>
			<article-title>Optimization of Operations in Supply Chain Systems Using Hybrid Systems Approach and Model Predictive Control</article-title>
			<source>Ind Eng Chem Res</source>
			<year>2006</year>
			<volume>45</volume>
			<fpage> 6493</fpage>
			<lpage>6503</lpage>
			</element-citation>
			</ref>
		<ref id="CIT0061">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Min</surname>
				<given-names>H</given-names>
			</name>
			<name>
				<surname>Zhou</surname>
				<given-names>G</given-names>
			</name>
			</person-group>
			<article-title>Supply chain modeling: past, present and future</article-title>
			<source>Computers &amp; Industrial Engineering</source>
			<year>2002</year>
			<volume>43</volume>
			<fpage>231</fpage>
			<lpage>249</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/S0360-8352(02)00066-9">http://dx.doi.org/10.1016/S0360-8352(02)00066-9</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0062">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Miranbeigi</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Jalali</surname>
				<given-names>A</given-names>
			</name>
			<name>
				<surname>Miranbeigi</surname>
				<given-names>A</given-names>
			</name>
			</person-group>
			<article-title>A Constrained Inventory Level Optimal Control on Supply Chain Management System</article-title>
			<source>Int J Innov Manag Technol</source>
			<year>2010</year>
			<volume>1</volume>
			<issue>1</issue>
			<fpage>69</fpage>
			<lpage>74</lpage>
			</element-citation>
			</ref>
		<ref id="CIT0063">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Mourtzis</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Papokostas</surname>
				<given-names>N</given-names>
			</name>
			<name>
				<surname>Makris</surname>
				<given-names>S</given-names>
			</name>
			<name>
				<surname>Xanthakis</surname>
				<given-names>V</given-names>
			</name>
			<name>
				<surname>Chryssolouris</surname>
				<given-names>G</given-names>
			</name>
			</person-group>
			<article-title>Supply chain modeling and control for producing highly customized products</article-title>
			<source>CIRP Ann Manufacturing Technol</source>
			<year>2008</year>
			<volume>57</volume>
			<fpage>451</fpage>
			<lpage>454</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.cirp.2008.03.106">http://dx.doi.org/10.1016/j.cirp.2008.03.106</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0064">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Niu</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Zhao</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Xu</surname>
				<given-names>Z</given-names>
			</name>
			<name>
				<surname>Shao</surname>
				<given-names>Z</given-names>
			</name>
			<name>
				<surname>Qian</surname>
				<given-names>J</given-names>
			</name>
			</person-group>
			<article-title>Model predictive control with dynamic pricing and probability inventory of a single supply chain unit</article-title>
			<source>Asia-Pac J Chem Eng</source>
			<year>2013</year>
			<volume>8</volume>
			<fpage>547</fpage>
			<lpage>554</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1002/apj.1695">http://dx.doi.org/10.1002/apj.1695</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0065">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Palander</surname>
				<given-names>T</given-names>
			</name>
			<name>
				<surname>Väätäinen</surname>
				<given-names>J</given-names>
			</name>
			</person-group>
			<article-title>Impacts of interenterprise collaboration and backhauling on wood procurement in Finland</article-title>
			<source>Scand J Forest Res</source>
			<year>2005</year>
			<volume>20</volume>
			<fpage>177</fpage>
			<lpage>183</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1080/02827580510008301">http://dx.doi.org/10.1080/02827580510008301</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0066">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Palander</surname>
				<given-names>T</given-names>
			</name>
			<name>
				<surname>Kainulainen</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Koskinen</surname>
				<given-names>R</given-names>
			</name>
			</person-group>
			<article-title>A computer-supported group decision making system for timber procurement planning in Finland</article-title>
			<source>Scand J Forest Res</source>
			<year>2005</year>
			<volume>20</volume>
			<fpage>514</fpage>
			<lpage>520</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1080/02827580500339823">http://dx.doi.org/10.1080/02827580500339823</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0067">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Pannek</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Frazzon</surname>
				<given-names>E</given-names>
			</name>
			</person-group>
			<article-title>Supply Chain Optimization via Distributed Model Predictive Control</article-title>
			<source>Proc Appl Math Mech</source>
			<year>2014</year>
			<volume>14</volume>
			<fpage>905</fpage>
			<lpage>906</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1002/pamm.201410433">http://dx.doi.org/10.1002/pamm.201410433</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0068">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Park</surname>
				<given-names>B-c</given-names>
			</name>
			<name>
				<surname>Jeong</surname>
				<given-names>S</given-names>
			</name>
			</person-group>
			<article-title>A Modeling Framework of Supply Chain Simulation</article-title>
			<source>J Supply Chain Oper Manag</source>
			<year>2014</year>
			<volume>12</volume>
			<issue>2</issue>
			<fpage>91</fpage>
			<lpage>106</lpage>
			</element-citation>
			</ref>
		<ref id="CIT0069">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Parmigiani</surname>
				<given-names>A</given-names>
			</name>
			<name>
				<surname>Klassen</surname>
				<given-names>RD</given-names>
			</name>
			<name>
				<surname>Russo</surname>
				<given-names>MV</given-names>
			</name>
			</person-group>
			<article-title>Efficiency meets accountability: Performance implications of supply chain configuration, control, and capabilities</article-title>
			<source>J Oper Manag</source>
			<year>2011</year>
			<volume>29</volume>
			<fpage>212</fpage>
			<lpage>223</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.jom.2011.01.001">http://dx.doi.org/10.1016/j.jom.2011.01.001</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0070">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Perea-López</surname>
				<given-names>E</given-names>
			</name>
			<name>
				<surname>Ydstie</surname>
				<given-names>BE</given-names>
			</name>
			<name>
				<surname>Grossmann</surname>
				<given-names>IE</given-names>
			</name>
			</person-group>
			<article-title>A model predictive control strategy for supply chain optimization</article-title>
			<source>Computers Chemical Engineering</source>
			<year>2003</year>
			<volume>27</volume>
			<fpage>1201</fpage>
			<lpage>1218</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/S0098-1354(03)00047-4">http://dx.doi.org/10.1016/S0098-1354(03)00047-4</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0071">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Petrovic</surname>
				<given-names>D</given-names>
			</name>
			<name>
				<surname>Roy</surname>
				<given-names>R</given-names>
			</name>
			<name>
				<surname>Petrovic</surname>
				<given-names>R</given-names>
			</name>
			</person-group>
			<article-title>Supply chain modelling using fuzzy sets</article-title>
			<source>Int J Production Economics</source>
			<year>1999</year>
			<volume>59</volume>
			<fpage>443</fpage>
			<lpage>453</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/S0925-5273(98)00109-1">http://dx.doi.org/10.1016/S0925-5273(98)00109-1</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0072">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Puigjaner</surname>
				<given-names>L</given-names>
			</name>
			<name>
				<surname>Laínez</surname>
				<given-names>JM</given-names>
			</name>
			</person-group>
			<article-title>Capturing dynamics in integrated supply chain management</article-title>
			<source>Computers Chemic Engin</source>
			<year>2008</year>
			<volume>32</volume>
			<fpage>2582</fpage>
			<lpage>2605</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.compchemeng.2007.10.003">http://dx.doi.org/10.1016/j.compchemeng.2007.10.003</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0073">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Rong</surname>
				<given-names>A</given-names>
			</name>
			<name>
				<surname>Akkerman</surname>
				<given-names>R</given-names>
			</name>
			<name>
				<surname>Grunow</surname>
				<given-names>M</given-names>
			</name>
			</person-group>
			<article-title>An optimization approach for managing fresh food quality throughout the supply chain</article-title>
			<source>Int J Produc Econom</source>
			<year>2011</year>
			<volume>131</volume>
			<fpage>421</fpage>
			<lpage>429</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.ijpe.2009.11.026">http://dx.doi.org/10.1016/j.ijpe.2009.11.026</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0074">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			</person-group>
			<article-title>Optimization in forestry</article-title>
			<source>Math Program Ser.</source>
			<year>2003</year>
			<volume>B</volume>
			<issue>97</issue>
			<fpage>267</fpage>
			<lpage>284</lpage>
			</element-citation>
			</ref>
		<ref id="CIT0075">
		<element-citation publication-type="book">
			<person-group person-group-type="author">
			<name>
				<surname>Rönnqvist</surname>
				<given-names>M</given-names>
			</name>
			<name>
				<surname>Sahlin</surname>
				<given-names>H</given-names>
			</name>
			<name>
				<surname>Carlsson</surname>
				<given-names>D</given-names>
			</name>
			</person-group>
			<source>Operative Planning Dispatching Forestry Transportation</source>
			<year>1998</year>
			<publisher-name>LiTH-MAT-R</publisher-name>
			<fpage>1</fpage>
			<lpage>31</lpage>
			</element-citation>
			</ref>
		<ref id="CIT0076">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Sarimveis</surname>
				<given-names>H</given-names>
			</name>
			<name>
				<surname>Patrinos</surname>
				<given-names>P</given-names>
			</name>
			<name>
				<surname>Tarantilis</surname>
				<given-names>CD</given-names>
			</name>
			<name>
				<surname>Kiranoudis</surname>
				<given-names>CT</given-names>
			</name>
			</person-group>
			<article-title>Dynamic modeling and control of supply chain systems: A review</article-title>
			<source>Computers &amp; Operations Research</source>
			<year>2008</year>
			<volume>35</volume>
			<fpage>3530</fpage>
			<lpage>3561</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.cor.2007.01.017">http://dx.doi.org/10.1016/j.cor.2007.01.017</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0077">
		<element-citation publication-type="book">
			<person-group person-group-type="author">
			<name>
				<surname>Seborg</surname>
				<given-names>DE</given-names>
			</name>
			<name>
				<surname>Edgar</surname>
				<given-names>TF</given-names>
			</name>
			<name>
				<surname>Mellichamp</surname>
				<given-names>DA</given-names>
			</name>
			</person-group>
			<source>Process dynamics and control</source>
			<year>2004</year>
			<edition>2</edition>
			<size units="pages">713</size>
			<publisher-name>John Wiley &amp; Sons, Inc.</publisher-name>
			<publisher-loc>USA</publisher-loc>
			</element-citation>
			</ref>
		<ref id="CIT0078">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Seferlis</surname>
				<given-names>P</given-names>
			</name>
			<name>
				<surname>Giannelos</surname>
				<given-names>NF</given-names>
			</name>
			</person-group>
			<article-title>A two-layered optimisation-based control strategy for multi-echelon supply chain networks</article-title>
			<source>Computers Chemic Engin</source>
			<year>2004</year>
			<volume>28</volume>
			<fpage>799</fpage>
			<lpage>809</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.compchemeng.2004.02.022">http://dx.doi.org/10.1016/j.compchemeng.2004.02.022</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0079">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Seuring</surname>
				<given-names>S</given-names>
			</name>
			</person-group>
			<article-title>Supply Chain Management for Sustainable Products – Insights From Research Applying Mixed Methodologies</article-title>
			<source>Bus Strat Env</source>
			<year>2011</year>
			<volume>20</volume>
			<fpage>471</fpage>
			<lpage>484</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1002/bse.702">http://dx.doi.org/10.1002/bse.702</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0080">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Stevens</surname>
				<given-names>GC</given-names>
			</name>
			</person-group>
			<article-title>Integrating the Supply Chain</article-title>
			<source>International Journal of Physical Distribution &amp; Materials Management</source>
			<year>1989</year>
			<volume>19</volume>
			<issue>8</issue>
			<fpage>3</fpage>
			<lpage>8</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1108/EUM0000000000329">http://dx.doi.org/10.1108/EUM0000000000329</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0081">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Subramanian</surname>
				<given-names>K</given-names>
			</name>
			<name>
				<surname>Rawlings</surname>
				<given-names>JB</given-names>
			</name>
			<name>
				<surname>Maravelias</surname>
				<given-names>CT</given-names>
			</name>
			<name>
				<surname>Flores-Cerrillo</surname>
				<given-names>J</given-names>
			</name>
			<name>
				<surname>Megan</surname>
				<given-names>L</given-names>
			</name>
			</person-group>
			<article-title>Integration of control theory and scheduling methods for supply chain management</article-title>
			<source>Computers Chemic Engin</source>
			<year>2013</year>
			<volume>51</volume>
			<fpage>4</fpage>
			<lpage>20</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.compchemeng.2012.06.012">http://dx.doi.org/10.1016/j.compchemeng.2012.06.012</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0082">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Subramanian</surname>
				<given-names>K</given-names>
			</name>
			<name>
				<surname>Rawlings</surname>
				<given-names>JB</given-names>
			</name>
			<name>
				<surname>Maravelias</surname>
				<given-names>CT</given-names>
			</name>
			</person-group>
			<article-title>Economic model predictive control for inventory management in supply chains</article-title>
			<source>Computers Chemic Engin</source>
			<year>2014</year>
			<volume>64</volume>
			<fpage>71</fpage>
			<lpage>80</lpage>
			</element-citation>
			</ref>
		<ref id="CIT0083">
	<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Swaminathan</surname>
				<given-names>JM</given-names>
			</name>
			<name>
				<surname>Smith</surname>
				<given-names>SF</given-names>
			</name>
			<name>
				<surname>Sadeh</surname>
				<given-names>NM</given-names>
			</name>
			</person-group>
			<article-title>Modeling Supply Chain Dynamics: A Multiagent Approach</article-title>
			<source>Decision Sciences</source>
			<year>1998</year>
			<volume>29</volume>
			<issue>3</issue>
			<fpage>607</fpage>
			<lpage>632</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1111/j.1540-5915.1998.tb01356.x">http://dx.doi.org/10.1111/j.1540-5915.1998.tb01356.x</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0084">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Tzafestas</surname>
				<given-names>S</given-names>
			</name>
			<name>
				<surname>Kapsiotis</surname>
				<given-names>G</given-names>
			</name>
			<name>
				<surname>Kyriannakis</surname>
				<given-names>E</given-names>
			</name>
			</person-group>
			<article-title>Model-based predictive control for generalized production planning problems</article-title>
			<source>Computers in Industry</source>
			<year>1997</year>
			<volume>34</volume>
			<fpage>201</fpage>
			<lpage>210</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/S0166-3615(97)00055-9">http://dx.doi.org/10.1016/S0166-3615(97)00055-9</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0085">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Varma</surname>
				<given-names>VK</given-names>
			</name>
			<name>
				<surname>Ferguson</surname>
				<given-names>I</given-names>
			</name>
			<name>
				<surname>Wild</surname>
				<given-names>I</given-names>
			</name>
			</person-group>
			<article-title>Decision support system for the sustainable forest management</article-title>
			<source>For Ecol Manag</source>
			<year>2000</year>
			<volume>128</volume>
			<fpage>49</fpage>
			<lpage>55</lpage>
			</element-citation>
			</ref>
		<ref id="CIT0086">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Vorst</surname>
				<given-names>JGAJ</given-names>
			</name>
			<name>
				<surname>Beulens</surname>
				<given-names>AJM</given-names>
			</name>
			</person-group>
			<article-title>Identifying sources of uncertainty to generate supply chain redesign strategies</article-title>
			<source>International Journal of Physical Distribution &amp; Logistics Management</source>
			<year>2002</year>
			<volume>32</volume>
			<issue>6</issue>
			<fpage>409</fpage>
			<lpage>430</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1108/09600030210437951">http://dx.doi.org/10.1108/09600030210437951</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0087">
		<element-citation publication-type="conf-proc">
			<person-group person-group-type="author">
			<name>
				<surname>Wang</surname>
				<given-names>J</given-names>
			</name>
			</person-group>
			<article-title>Model Predictive Control Strategy for Petrochemical Supply Chain Planning under Uncertainty</article-title>
			<conf-name>2013 International Conference on Mechatronic Sciences, Electric Engineering and Computer (MEC)</conf-name>
			<conf-loc>Shenyang, China</conf-loc>
			<conf-date>Dec 20-22</conf-date>
			<year>2013</year>
			<fpage>27</fpage>
			<lpage>30</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1109/mec.2013.6885045">http://dx.doi.org/10.1109/mec.2013.6885045</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0088">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Wang</surname>
				<given-names>W</given-names>
			</name>
			<name>
				<surname>Rivera</surname>
				<given-names>DE</given-names>
			</name>
			</person-group>
			<article-title>Model Predictive Control for Tactical Decision-Making in Semiconductor Manufacturing Supply Chain Management</article-title>
			<source>IEEE Transactions on Control Systems Technology</source>
			<year>2008</year>
			<volume>16</volume>
			<issue>5</issue>
			<fpage>841</fpage>
			<lpage>855</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1109/TCST.2007.916327">http://dx.doi.org/10.1109/TCST.2007.916327</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0089">
		<element-citation publication-type="conf-proc">
			<person-group person-group-type="author">
			<name>
				<surname>Wang</surname>
				<given-names>W</given-names>
			</name>
			<name>
				<surname>Rivera</surname>
				<given-names>DE</given-names>
			</name>
			<name>
				<surname>Kempf</surname>
				<given-names>KG</given-names>
			</name>
			<name>
				<surname>Smith</surname>
				<given-names>KD</given-names>
			</name>
			</person-group>
			<article-title>A Model Predictive Control Strategy for Supply Chain Management in Semiconductor Manufacturing under Uncertainty</article-title>
			<conf-name>2004 American Control Conference</conf-name>
			<conf-loc>Boston, MA</conf-loc>
			<conf-date>June 30-July 2</conf-date>
			<year>2004</year>
			<fpage>4577</fpage>
			<lpage>4582</lpage>
			</element-citation>
			</ref>
		<ref id="CIT0090">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Wang</surname>
				<given-names>W</given-names>
			</name>
			<name>
				<surname>Rivera</surname>
				<given-names>DE</given-names>
			</name>
			<name>
				<surname>Kempf</surname>
				<given-names>KG</given-names>
			</name>
			</person-group>
			<article-title>Model predictive control strategies for supply chain management in semiconductor manufacturing</article-title>
			<source>Int J Produc Econom</source>
			<year>2007</year>
			<volume>107</volume>
			<fpage>56</fpage>
			<lpage>77</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1016/j.ijpe.2006.05.013">http://dx.doi.org/10.1016/j.ijpe.2006.05.013</ext-link></comment>
			</element-citation>
			</ref>
		<ref id="CIT0091">
		<element-citation publication-type="journal">
			<person-group person-group-type="author">
			<name>
				<surname>Wang</surname>
				<given-names>Y</given-names>
			</name>
			<name>
				<surname>Boyd</surname>
				<given-names>S</given-names>
			</name>
			</person-group>
			<article-title>Fast Model Predictive Control Using Online Optimization</article-title>
			<source>IEEE Transactions on Control Systems Technology</source>
			<year>2010</year>
			<volume>18</volume>
			<issue>2</issue>
			<fpage>267</fpage>
			<lpage>278</lpage>
			<comment><ext-link ext-link-type="uri" xlink:href="http://dx.doi.org/10.1109/TCST.2009.2017934">http://dx.doi.org/10.1109/TCST.2009.2017934</ext-link></comment>
			</element-citation>
			</ref>
		</ref-list>
	</back>
</article>